Discover Opportunities months before the RFP drops
Learn more →Excavation of linear trenches, approx. 0.7 miles long in total, in the public way, for the installation of pre-cast manholes, concrete encased underground pvc conduits, under-bridge attached fre conduits and supports, including surface restoration
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Excavation of linear trenches, approx. 0.7 miles long in total, in the public way, for the installation of pre-cast manholes, concrete encased underground pvc conduits, under-bridge attached fre conduits and supports, including surface restoration
AvailableProvide re-roofing, remove insulation, clean, prime, and rehabilitate existing roof.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
Provide re-roofing, remove insulation, clean, prime, and rehabilitate existing roof.
AvailableWork includes Concrete patch repairs of the prestressed adjacent concrete deck beam superstructure. Rehabilitation of the top surface of roadway deck beams with UHPC overlay, membrane waterproofing and new bridge pavement. Replacement of roadway deck beam shear key mortar. Rehabilitation of the top surface of sidewalk deck beams with self-consolidating repair mortar. Bridge railing cleaning (full removal of existing coatings) and painting. The approach roadways within the limits of work will be repaved and receive new pavement markings. The road will be open to traffic during the rehabilitation of the sidewalk deck beams and the bridge railing cleaning (full removal painting). The road will be closed to traffic during the topside rehabilitation of the roadway deck beams, UHPC overlay, membrane waterproofing, new bridge pavement, and approach roadway work.
Posted Date
Nov 5, 2025
Due Date
Dec 11, 2025
Release: Nov 5, 2025
Close: Dec 11, 2025
Work includes Concrete patch repairs of the prestressed adjacent concrete deck beam superstructure. Rehabilitation of the top surface of roadway deck beams with UHPC overlay, membrane waterproofing and new bridge pavement. Replacement of roadway deck beam shear key mortar. Rehabilitation of the top surface of sidewalk deck beams with self-consolidating repair mortar. Bridge railing cleaning (full removal of existing coatings) and painting. The approach roadways within the limits of work will be repaved and receive new pavement markings. The road will be open to traffic during the rehabilitation of the sidewalk deck beams and the bridge railing cleaning (full removal painting). The road will be closed to traffic during the topside rehabilitation of the roadway deck beams, UHPC overlay, membrane waterproofing, new bridge pavement, and approach roadway work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis