Discover Opportunities months before the RFP drops
Learn more →The Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
The Project consists of the construction of a new finished water pumping station at the Rolling Mill Water Treatment Plant in the Town of North East and the decommissioning and demolition of the existing finished water pumping station. Work includes excavation, demolition, masonry building construction, watermain replacement, instrumentation, electrical work, control system integration, HVAC work, and site restoration. Decommissioning of the existing finished water pumping station shall include replacement of electrical raceways, furnishing and installing replacement submersible wastewater pumps and pump control panel, and capping water supply piping.
AvailableProject generally consists of the draining, dewatering, and removal of sediment in the raw water settling pond. Draining and dewatering includes pumping and filtering of the water layer in the pond. Removal of sediment includes extraction and dewatering of the sediment layer in the pond. All pond water, filtered sediment, and dewatered sediment is to be disposed of in accordance with applicable laws and regulations.
Posted Date
Apr 29, 2025
Due Date
Jun 3, 2025
Release: Apr 29, 2025
Close: Jun 3, 2025
Project generally consists of the draining, dewatering, and removal of sediment in the raw water settling pond. Draining and dewatering includes pumping and filtering of the water layer in the pond. Removal of sediment includes extraction and dewatering of the sediment layer in the pond. All pond water, filtered sediment, and dewatered sediment is to be disposed of in accordance with applicable laws and regulations.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis