Discover Opportunities months before the RFP drops
Learn more →Work shall consist of reconstructing Larsen Road from Clayton Avenue to CTH CB including the construction of a 10-foot wide asphalt recreation trail. The total project length is 1.0 miles. This is a Local Roads Improvement Program (LRIP) project and will consist of the following approximate quantities: Excavation Common: 12,275 C.Y.; Excavation Marsh: 10,912 C.Y.; Select Borrow: 6,652 C.Y.; Base Aggregate 1 1/4": 12,822 Tons; Breaker Run: 27,938 Tons; Asphalt Pavement: 7,292 Tons; Storm Sewer: 2,584 L.F.; Culvert Pipes: 310 L.F.; Fence Chain Link Salvaged: 1,045 L.F.; Pavement Marking: 20,060 L.F.; Restoration: 17,347 S.Y.; Traffic Signals.
Posted Date
Mar 3, 2025
Due Date
Mar 20, 2025
Release: Mar 3, 2025
Close: Mar 20, 2025
Work shall consist of reconstructing Larsen Road from Clayton Avenue to CTH CB including the construction of a 10-foot wide asphalt recreation trail. The total project length is 1.0 miles. This is a Local Roads Improvement Program (LRIP) project and will consist of the following approximate quantities: Excavation Common: 12,275 C.Y.; Excavation Marsh: 10,912 C.Y.; Select Borrow: 6,652 C.Y.; Base Aggregate 1 1/4": 12,822 Tons; Breaker Run: 27,938 Tons; Asphalt Pavement: 7,292 Tons; Storm Sewer: 2,584 L.F.; Culvert Pipes: 310 L.F.; Fence Chain Link Salvaged: 1,045 L.F.; Pavement Marking: 20,060 L.F.; Restoration: 17,347 S.Y.; Traffic Signals.
Work includes excavation common: 12,275 CY; excavation marsh: 10,912 CY; select borrow: 6,652 CY; base aggregate 1 1/2": 12,822 TN; asphalt pavement: 7,292 TN; storm sewer: 2,584 LF; culvert pipes: 310 LF; fence chain link salvaged: 1,045 LF; pavement marking: 20,060 LF; restoration: 17,347 CY.
Posted Date
Feb 27, 2025
Due Date
Mar 20, 2025
Release: Feb 27, 2025
Close: Mar 20, 2025
Work includes excavation common: 12,275 CY; excavation marsh: 10,912 CY; select borrow: 6,652 CY; base aggregate 1 1/2": 12,822 TN; asphalt pavement: 7,292 TN; storm sewer: 2,584 LF; culvert pipes: 310 LF; fence chain link salvaged: 1,045 LF; pavement marking: 20,060 LF; restoration: 17,347 CY.
Work includes construction of a stormwater pond including excavation (approximately 20,000 CY), storm sewer (approximately 1,800 LF), erosion controls and restoration.
Posted Date
Jan 30, 2025
Due Date
Feb 13, 2025
Release: Jan 30, 2025
Close: Feb 13, 2025
Work includes construction of a stormwater pond including excavation (approximately 20,000 CY), storm sewer (approximately 1,800 LF), erosion controls and restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis