Discover Opportunities months before the RFP drops
Learn more →Project includes approx. 2,490 LF Water Main, RJ Ductile Iron, Installed by Open Cut; 40 LF Water Service Pipe by Open Cut; 40 LF Water Service Pipe by HDD;5 EA Combination Air Release Valve Assembly; 50 LF Concrete Encasement. See Outside link.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Project includes approx. 2,490 LF Water Main, RJ Ductile Iron, Installed by Open Cut; 40 LF Water Service Pipe by Open Cut; 40 LF Water Service Pipe by HDD;5 EA Combination Air Release Valve Assembly; 50 LF Concrete Encasement. See Outside link.
AvailableRemoval and salvage of four (4) barns located on town-owned property to fully remove the structures, restore the sites, and retain salvage rights to the materials.
Posted Date
Oct 15, 2025
Due Date
Nov 18, 2025
Release: Oct 15, 2025
Close: Nov 18, 2025
Removal and salvage of four (4) barns located on town-owned property to fully remove the structures, restore the sites, and retain salvage rights to the materials.
This project involves removal of an existing timber retaining wall along Sunset Drive (36.4803, -81.8120) that has begun to fail. The scope includes the removal of the timbers and replacement with 2 ft × 2 ft × 4 ft interlocking concrete block and proper drainage.
Posted Date
Sep 10, 2025
Due Date
Sep 30, 2025
Release: Sep 10, 2025
Close: Sep 30, 2025
This project involves removal of an existing timber retaining wall along Sunset Drive (36.4803, -81.8120) that has begun to fail. The scope includes the removal of the timbers and replacement with 2 ft × 2 ft × 4 ft interlocking concrete block and proper drainage.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis