Discover Opportunities months before the RFP drops
Learn more →Culvert replacement and roadway work for town. The Project includes the following Work: Thompson Road – Remove existing culvert, install new pipe arch culvert with rock armoring, raise roadway elevation, complete mitigation measures (crowning, check dams, stone line ditches), and associated work.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
Culvert replacement and roadway work for town. The Project includes the following Work: Thompson Road – Remove existing culvert, install new pipe arch culvert with rock armoring, raise roadway elevation, complete mitigation measures (crowning, check dams, stone line ditches), and associated work.
AvailableThe Project includes the following Work: Holt Road – Remove temporary bridge, demolish old bridge, cast-in-place concrete footersstemwalls, installation of new BridgeCor culvert with aluminum headwalls, rock armoring, roadway construction and associated work. Laird Pond Road – Remove existing culvert, cast-in-place concrete footers-stemwalls, installation of new aluminum arch culvert, rock armoring, roadway construction and associated work. Pigeon Pond Road – Remove existing culvert, precast concrete box culvert installation, rock armoring, roadway construction and associated work. Maple Hill Road – Remove existing culvert, installation of pipe arch culvert with cast-in-place headwalls, rock armoring, roadway construction and associated wor
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Holt Road – Remove temporary bridge, demolish old bridge, cast-in-place concrete footersstemwalls, installation of new BridgeCor culvert with aluminum headwalls, rock armoring, roadway construction and associated work. Laird Pond Road – Remove existing culvert, cast-in-place concrete footers-stemwalls, installation of new aluminum arch culvert, rock armoring, roadway construction and associated work. Pigeon Pond Road – Remove existing culvert, precast concrete box culvert installation, rock armoring, roadway construction and associated work. Maple Hill Road – Remove existing culvert, installation of pipe arch culvert with cast-in-place headwalls, rock armoring, roadway construction and associated wor
AvailableThe Project includes the following Work: Cassady Road, Bridge 22 – Demolish old bridge, installation of new bridge (85’ clear span, NEDBT precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated wor.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Cassady Road, Bridge 22 – Demolish old bridge, installation of new bridge (85’ clear span, NEDBT precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated wor.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis