Discover Opportunities months before the RFP drops
Learn more →Seeking sealed bids for the supply, and installation of energy-efficient lighting systems. 1. Outdoor lighting system. * install a new, energy-efficient lighting system at town hall capable of being managed remotely or manually (on/off control). * multi-use purpose for security lighting and holiday lighting * current system operates continuously (24/7); the new system must provide controllability and energy-saving functionality.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
Seeking sealed bids for the supply, and installation of energy-efficient lighting systems. 1. Outdoor lighting system. * install a new, energy-efficient lighting system at town hall capable of being managed remotely or manually (on/off control). * multi-use purpose for security lighting and holiday lighting * current system operates continuously (24/7); the new system must provide controllability and energy-saving functionality.
Available1. HVAC system retrofit: * upgrade existing HVAC systems from 14 SEER to 16 SEER efficiency ratings in town hall utility room. * replace outdated equipment with higher-efficiency units designed to reduce energy consumption and operating costs. * retrofit to include all necessary components, installation, testing, and verification. 2. Boiler system replacement. See attached file for full scope.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
1. HVAC system retrofit: * upgrade existing HVAC systems from 14 SEER to 16 SEER efficiency ratings in town hall utility room. * replace outdated equipment with higher-efficiency units designed to reduce energy consumption and operating costs. * retrofit to include all necessary components, installation, testing, and verification. 2. Boiler system replacement. See attached file for full scope.
AvailablePropane service for the period starting August 1, 2025, and ending June 30, 2026.
Posted Date
Jul 15, 2025
Due Date
Jul 30, 2025
Release: Jul 15, 2025
Close: Jul 30, 2025
Propane service for the period starting August 1, 2025, and ending June 30, 2026.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis