Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1. HVAC system retrofit: * upgrade existing HVAC systems from 14 SEER to 16 SEER efficiency ratings in town hall utility room. * replace outdated equipment with higher-efficiency units designed to reduce energy consumption and operating costs. * retrofit to include all necessary components, installation, testing, and verification. 2. Boiler system replacement. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Work consists of Motor Pool Heating, Ventilation, and Air Conditioning (“HVAC”) and Roof Upgrade project. The Work, includes, but is not limited to: Removal of existing roof on main building; Installation of new roof on main building; Extend main building parapet, clad with metal panel; Install new skylight; Replace damaged interior ceiling tile with new ceiling tile; Supply new door; Supply rooftop safety equipment; Replacement of entire HVAC building control system with the Schneider Electric EcoStruxture.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Work consists of Motor Pool Heating, Ventilation, and Air Conditioning (“HVAC”) and Roof Upgrade project. The Work, includes, but is not limited to: Removal of existing roof on main building; Installation of new roof on main building; Extend main building parapet, clad with metal panel; Install new skylight; Replace damaged interior ceiling tile with new ceiling tile; Supply new door; Supply rooftop safety equipment; Replacement of entire HVAC building control system with the Schneider Electric EcoStruxture.
AvailableThe Oregon Department of Administrative Services is soliciting competitive sealed bids to upgrade HVAC systems and re‑roof the Salem Motor Pool facility, including new roofing, parapet extension, skylight, HVAC equipment replacement, controls, and safety equipment. Attendance at a mandatory pre‑bid conference is required for bid responsiveness.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
The Oregon Department of Administrative Services is soliciting competitive sealed bids to upgrade HVAC systems and re‑roof the Salem Motor Pool facility, including new roofing, parapet extension, skylight, HVAC equipment replacement, controls, and safety equipment. Attendance at a mandatory pre‑bid conference is required for bid responsiveness.
AvailableUpgrade HVAC.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
Upgrade HVAC.
Availableto provide Design-Build Entity Services for the public works project commonly referred to as the Energy Efficiency project ("Project"). and generally consists of repairs to the Stockton campus parking lots and HVAC, as well as install photovoltaic panels ("Solar Energy Installation") in the parking lots.
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
Close: Dec 15, 2025
to provide Design-Build Entity Services for the public works project commonly referred to as the Energy Efficiency project ("Project"). and generally consists of repairs to the Stockton campus parking lots and HVAC, as well as install photovoltaic panels ("Solar Energy Installation") in the parking lots.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis