Discover Opportunities months before the RFP drops
Learn more →The Town of Cheshire is accepting proposals from responsible, qualified design professionals for architectural and engineering services associated with the establishment of an adaptive synthetic turf field at Cheshire Park. The Town will receive Proposals for DESIGN PROFESSIONAL SERVICES, ADAPTIVE TURF FIELD CHESHIRE PARK until 11:00 AM on December 12th, 2025, at the office of Cheshire Public Works Room 213, Cheshire Town Hall, 84 South Main Street, Cheshire, Connecticut 06410. At that time, proposals will be acknowledged in public.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Close: Dec 11, 2025
The Town of Cheshire is accepting proposals from responsible, qualified design professionals for architectural and engineering services associated with the establishment of an adaptive synthetic turf field at Cheshire Park. The Town will receive Proposals for DESIGN PROFESSIONAL SERVICES, ADAPTIVE TURF FIELD CHESHIRE PARK until 11:00 AM on December 12th, 2025, at the office of Cheshire Public Works Room 213, Cheshire Town Hall, 84 South Main Street, Cheshire, Connecticut 06410. At that time, proposals will be acknowledged in public.
Town and school physical security upgrades.
Posted Date
Nov 7, 2025
Due Date
Dec 11, 2025
Release: Nov 7, 2025
Close: Dec 11, 2025
Town and school physical security upgrades.
Work include demolition of existing water source heat pump system including the fan coil units, controls, heat pumps, and heat exchanger with the associated pumps. Provision and installation of new heat pumps, fan coil units and controls with some new ductwork. Provision and installation of a cooling tower for heat rejection. Provision and installation of an electric boiler for heat addition. Patch and repair to match existing of all walls and ceilings damaged during demolition and removal of old and installation of new equipment. Electrical: provide removal and relocation of existing hvac equipment circuits and provide new circuits for hvac equipment, to include all breakers, conduit, wire and disconnects as specified.
Posted Date
Aug 28, 2025
Due Date
Sep 25, 2025
Release: Aug 28, 2025
Close: Sep 25, 2025
Work include demolition of existing water source heat pump system including the fan coil units, controls, heat pumps, and heat exchanger with the associated pumps. Provision and installation of new heat pumps, fan coil units and controls with some new ductwork. Provision and installation of a cooling tower for heat rejection. Provision and installation of an electric boiler for heat addition. Patch and repair to match existing of all walls and ceilings damaged during demolition and removal of old and installation of new equipment. Electrical: provide removal and relocation of existing hvac equipment circuits and provide new circuits for hvac equipment, to include all breakers, conduit, wire and disconnects as specified.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis