Discover Opportunities months before the RFP drops
Learn more →Procurement of single-phase pole mounted transformers 15 kVA to 167kVA, single phase pad mounted transformers 15kVA to 167kVA and three phase pad mounted transformers 45kVA to 1500kVA (individually and collectively referred to as "Transformers" or "Equipment".
Posted Date
Nov 6, 2025
Due Date
Jan 27, 2026
Release: Nov 6, 2025
Close: Jan 27, 2026
Procurement of single-phase pole mounted transformers 15 kVA to 167kVA, single phase pad mounted transformers 15kVA to 167kVA and three phase pad mounted transformers 45kVA to 1500kVA (individually and collectively referred to as "Transformers" or "Equipment".
AvailableNetarts Getaway for the Oceanside Substation Project. Contractor shall install sixteen (16) E20 vaults, three (3) runs of 3" Schedule 40 PVC with mule tape, warning tape, and warning signs PVC must be solid gray. Depth of PVC shall be a minimum of 48" deep from existing grade to the top of pipe. Contractor bid to include the supply of all vaults, PVC, mule tape, and warning signs.Contractor shall trench and install. Contractor shall clean the installed PVC runs after installation and run an appropriately sized wire brush and flexible mandrel through the PVC prior to installing mule tape. Contractor shall remove and dispose of any excavated material, bore material, and/or garbage from the jobsite and private property upon completion of each day's work.
Posted Date
Nov 13, 2025
Due Date
Jan 28, 2026
Release: Nov 13, 2025
Close: Jan 28, 2026
Netarts Getaway for the Oceanside Substation Project. Contractor shall install sixteen (16) E20 vaults, three (3) runs of 3" Schedule 40 PVC with mule tape, warning tape, and warning signs PVC must be solid gray. Depth of PVC shall be a minimum of 48" deep from existing grade to the top of pipe. Contractor bid to include the supply of all vaults, PVC, mule tape, and warning signs.Contractor shall trench and install. Contractor shall clean the installed PVC runs after installation and run an appropriately sized wire brush and flexible mandrel through the PVC prior to installing mule tape. Contractor shall remove and dispose of any excavated material, bore material, and/or garbage from the jobsite and private property upon completion of each day's work.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis