Discover Opportunities months before the RFP drops
Learn more →Aggregate surfacing (class 1 mod.) 18,227 ton; full depth reclamation 98,394 SY; mill bituminous surface 3,109 SY; bituminous wearing course mixture 40,8636 ton.
Posted Date
Aug 19, 2025
Due Date
Sep 16, 2025
Release: Aug 19, 2025
Close: Sep 16, 2025
Aggregate surfacing (class 1 mod.) 18,227 ton; full depth reclamation 98,394 SY; mill bituminous surface 3,109 SY; bituminous wearing course mixture 40,8636 ton.
Demolition of old shower stalls and installation of new shower stalls in apartment building.
Posted Date
Jul 2, 2025
Due Date
Jul 24, 2025
Release: Jul 2, 2025
Close: Jul 24, 2025
Demolition of old shower stalls and installation of new shower stalls in apartment building.
Work includes addition of exterior canopies at pedestrian entry points to improve protection from falling snow and ice from overhead thru-wall air conditioning units.
Posted Date
Jul 2, 2025
Due Date
Jul 24, 2025
Release: Jul 2, 2025
Close: Jul 24, 2025
Work includes addition of exterior canopies at pedestrian entry points to improve protection from falling snow and ice from overhead thru-wall air conditioning units.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis