Discover Opportunities months before the RFP drops
Learn more →Perform a cultural resource survey to remediate physical safety hazards for 60 abandoned mine features.
Posted Date
Dec 10, 2025
Due Date
Dec 19, 2025
Release: Dec 10, 2025
Close: Dec 19, 2025
Perform a cultural resource survey to remediate physical safety hazards for 60 abandoned mine features.
AvailableRequires septic pumping, debris removal, transport, and disposal services for vault toilets, holding tanks, and lift stations.
Posted Date
Dec 3, 2025
Due Date
Dec 16, 2025
Release: Dec 3, 2025
Close: Dec 16, 2025
Requires septic pumping, debris removal, transport, and disposal services for vault toilets, holding tanks, and lift stations.
AvailableRemove, dispose, and replace the existing 1,201 SF of Metal Pro Panel Roof with gutters and downspouts. Also remove, dispose, and replace the existing 1,201 SF of Linoleum flooring with new vinyl flooring within the Single wide manufactured base home. Upon Removal of the old linoleum flooring contractor shall reinstall any damaged sub flooring, moisture barrier and new wood grain vinyl flooring as well as any molding that may be required.
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
Close: Dec 22, 2025
Remove, dispose, and replace the existing 1,201 SF of Metal Pro Panel Roof with gutters and downspouts. Also remove, dispose, and replace the existing 1,201 SF of Linoleum flooring with new vinyl flooring within the Single wide manufactured base home. Upon Removal of the old linoleum flooring contractor shall reinstall any damaged sub flooring, moisture barrier and new wood grain vinyl flooring as well as any molding that may be required.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis