Discover Opportunities months before the RFP drops
Learn more →Install an above ground concrete pad within the tank area. Concrete pad will include an 8" altitude valve along with 8" ductile iron piping to connect this to the existing 10"pvc piping within the tank area, and restore the ground to its original condition.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Install an above ground concrete pad within the tank area. Concrete pad will include an 8" altitude valve along with 8" ductile iron piping to connect this to the existing 10"pvc piping within the tank area, and restore the ground to its original condition.
AvailableFurnish and supply treatment plant chemicals and salt.
Posted Date
Nov 7, 2025
Due Date
Nov 19, 2025
Release: Nov 7, 2025
Close: Nov 19, 2025
Furnish and supply treatment plant chemicals and salt.
Work includes approx 5,350 LF of 8" & 6" ductile iron water main and appurtenances along several roads including 4 connections to existing mains, 56 service replacements, and 4 trenchless road crossings.
Posted Date
Oct 8, 2025
Due Date
Oct 22, 2025
Release: Oct 8, 2025
Close: Oct 22, 2025
Work includes approx 5,350 LF of 8" & 6" ductile iron water main and appurtenances along several roads including 4 connections to existing mains, 56 service replacements, and 4 trenchless road crossings.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis