Discover Opportunities months before the RFP drops
Learn more →Work include sewer line spot repair & lateral abandonment services.
Posted Date
Oct 31, 2025
Due Date
Nov 24, 2025
Release: Oct 31, 2025
Close: Nov 24, 2025
Work include sewer line spot repair & lateral abandonment services.
Provide engineering consultants to analyze the hydraulics of the district's existing sewer force mains and assess the need for rehabilitation or replacement of air release valves (arvs). The objective of this project is to evaluate existing sewer flows and determine the appropriate sizing and location of arvs along sewer force mains within our sewer collection system. The selected firm will be responsible for conducting a comprehensive hydraulic analysis to ensure the efficient and reliable operation of the sewer force mains.
Posted Date
Aug 15, 2025
Due Date
Sep 19, 2025
Release: Aug 15, 2025
Close: Sep 19, 2025
Provide engineering consultants to analyze the hydraulics of the district's existing sewer force mains and assess the need for rehabilitation or replacement of air release valves (arvs). The objective of this project is to evaluate existing sewer flows and determine the appropriate sizing and location of arvs along sewer force mains within our sewer collection system. The selected firm will be responsible for conducting a comprehensive hydraulic analysis to ensure the efficient and reliable operation of the sewer force mains.
Provide emulsion polymer.
Posted Date
Aug 15, 2025
Due Date
Aug 29, 2025
Release: Aug 15, 2025
Close: Aug 29, 2025
Provide emulsion polymer.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis