Learn more →Lease Smyrna Airport (MQY) property upon which to design, construct, finance, operate, and maintain aeronautical-use facilities. There are two (2) parcels totaling approx 3.4 acres available for lease and aeronautical development.
Posted Date
Nov 3, 2025
Due Date
Mar 3, 2026
Release: Nov 3, 2025
Close: Mar 3, 2026
Lease Smyrna Airport (MQY) property upon which to design, construct, finance, operate, and maintain aeronautical-use facilities. There are two (2) parcels totaling approx 3.4 acres available for lease and aeronautical development.
AvailableProject involves rehabilitation and reconstruction of portions of the pavements for the airport's primary 8,037' by 150' runway and the re-grading of the associated adjacent runway safety areas (rsas) out to a 500' overall width. Along with these paving and grading efforts, the project will include miscellaneous storm drainage improvements, runway edge lighting improvements, internally lit signage relocations, new supplemental wind cones, new precision approach path indicators (papis) for each runway end, and replacement of the runway 32 approach light system's threshold bar. This project 1 will focus on the rehabilitation of 2,500' of the runway's length at the runway 14 end and the reconstruction of 3,187' of the runway's length at the runway 32 end. Some key approximate quantities for the various paving and grading efforts include the following: removal to a 12" depth of 11,230 SY of light duty weathered asphalt in a paved overrun area, and re-grading with topsoil placement for turf establishment.
Posted Date
May 28, 2025
Due Date
Jun 26, 2025
Release: May 28, 2025
Close: Jun 26, 2025
Project involves rehabilitation and reconstruction of portions of the pavements for the airport's primary 8,037' by 150' runway and the re-grading of the associated adjacent runway safety areas (rsas) out to a 500' overall width. Along with these paving and grading efforts, the project will include miscellaneous storm drainage improvements, runway edge lighting improvements, internally lit signage relocations, new supplemental wind cones, new precision approach path indicators (papis) for each runway end, and replacement of the runway 32 approach light system's threshold bar. This project 1 will focus on the rehabilitation of 2,500' of the runway's length at the runway 14 end and the reconstruction of 3,187' of the runway's length at the runway 32 end. Some key approximate quantities for the various paving and grading efforts include the following: removal to a 12" depth of 11,230 SY of light duty weathered asphalt in a paved overrun area, and re-grading with topsoil placement for turf establishment.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis