Discover Opportunities months before the RFP drops
Learn more →Project includes the following work: reinforced concrete low water crossing, loose rip rap, grading and related work. Work includes 5,900 CY roadway excavation (plan quantity); 200 CY untreated base course (plan quantity); 350 SY concrete low water crossing and headwall; 1,280 CY riprap, d50 = 22 inches; 960 SY geotextile filter fabric.
Posted Date
Mar 11, 2025
Due Date
Apr 2, 2025
Release: Mar 11, 2025
Close: Apr 2, 2025
Project includes the following work: reinforced concrete low water crossing, loose rip rap, grading and related work. Work includes 5,900 CY roadway excavation (plan quantity); 200 CY untreated base course (plan quantity); 350 SY concrete low water crossing and headwall; 1,280 CY riprap, d50 = 22 inches; 960 SY geotextile filter fabric.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis