Discover Opportunities months before the RFP drops
Learn more →To provide all the necessary equipment, labor, materials, and incidentals to replace 4 big condensing ground units and 14 evaporator coils with 5 remote condensing units and 14 evaporative coils located behind the food service outside warehouse.
Posted Date
Dec 10, 2025
Due Date
Dec 29, 2025
Release: Dec 10, 2025
Close: Dec 29, 2025
To provide all the necessary equipment, labor, materials, and incidentals to replace 4 big condensing ground units and 14 evaporator coils with 5 remote condensing units and 14 evaporative coils located behind the food service outside warehouse.
AvailableThe Federal Bureau of Prisons Field Acquisition Office (FBOP FAO) issued RFQ 15BFA025Q00000300 for mortuary services at Federal Medical Center (FMC) Fort Worth, TX, including burial, cremation, refrigeration, and transportation services. The procurement is a combined synopsis/solicitation (Request for Quotation), set aside 100% for Total Small Business, NAICS 812210, and will be awarded on an indefinite delivery/requirements basis with firm-fixed unit pricing (base year + four 12-month options) based on price and past performance. Quotes are due Dec 24, 2025 per SAM.gov and must be submitted via email to Michael Blaisdell (mblaisdell@bop.gov) following instructions in Section L of the solicitation document.
Posted Date
Dec 10, 2025
Due Date
Dec 24, 2025
Release: Dec 10, 2025
Close: Dec 24, 2025
The Federal Bureau of Prisons Field Acquisition Office (FBOP FAO) issued RFQ 15BFA025Q00000300 for mortuary services at Federal Medical Center (FMC) Fort Worth, TX, including burial, cremation, refrigeration, and transportation services. The procurement is a combined synopsis/solicitation (Request for Quotation), set aside 100% for Total Small Business, NAICS 812210, and will be awarded on an indefinite delivery/requirements basis with firm-fixed unit pricing (base year + four 12-month options) based on price and past performance. Quotes are due Dec 24, 2025 per SAM.gov and must be submitted via email to Michael Blaisdell (mblaisdell@bop.gov) following instructions in Section L of the solicitation document.
AvailableReplace boilers & controls. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
Replace boilers & controls. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing. See attached file.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis