Learn more →Work includes construction of a new pumping station, including a new wet well, raw sewage pumps, pump controls, and all other appurtenances, as well as the installation of a valve and metering vault, emergency generator, and telemetry equipment. Project also includes the selective demolition of existing pump station equipment. Also included is the replacement of approx 1,500 LF of force main with new 4" pipe.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Work includes construction of a new pumping station, including a new wet well, raw sewage pumps, pump controls, and all other appurtenances, as well as the installation of a valve and metering vault, emergency generator, and telemetry equipment. Project also includes the selective demolition of existing pump station equipment. Also included is the replacement of approx 1,500 LF of force main with new 4" pipe.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis