Discover Opportunities months before the RFP drops
Learn more →Santa Clara Unified School District is soliciting bids for Increment 2 Modernization Group 2 at Westwood Elementary School, including construction of a new multipurpose building with a full cooking kitchen and parking lot reconfiguration. The district intends to award multiple prime contracts by bid package, with mandatory pre‑bid walks and electronic submission via PlanetBids by the stated deadline.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
Close: Dec 10, 2025
Santa Clara Unified School District is soliciting bids for Increment 2 Modernization Group 2 at Westwood Elementary School, including construction of a new multipurpose building with a full cooking kitchen and parking lot reconfiguration. The district intends to award multiple prime contracts by bid package, with mandatory pre‑bid walks and electronic submission via PlanetBids by the stated deadline.
Santa Clara Unified School District is soliciting bids from prequalified prime contractors for the Increment 2 Modernization Group 2 project at Bracher Elementary School. The work includes a new multipurpose building with cooking kitchen, preschool/TK classroom buildings, play areas, parking lots, and related site and systems work across multiple bid packages.
Posted Date
Nov 11, 2025
Due Date
Nov 18, 2025
Release: Nov 11, 2025
Close: Nov 18, 2025
Santa Clara Unified School District is soliciting bids from prequalified prime contractors for the Increment 2 Modernization Group 2 project at Bracher Elementary School. The work includes a new multipurpose building with cooking kitchen, preschool/TK classroom buildings, play areas, parking lots, and related site and systems work across multiple bid packages.
New construction of single-story preschool/tk classroom buildings, parking lot and play area. Building concrete (a or c8); structural steel (c51); rough carpentry (b or c5); built-up bituminous roofing (c39); doors, frames and hardware (d28); aluminum storefront and glazing (c17); metal stud framing, insulation and drywall (b or c5 or c9); lath and plaster (c35); fire suppression (c16); plumbing (c36); hvac (c20); electrical (c10); photovoltaic solar panels (c10 or c46); site utilities (a or c34 or c36).
Posted Date
Jul 17, 2025
Due Date
Aug 14, 2025
Release: Jul 17, 2025
Close: Aug 14, 2025
New construction of single-story preschool/tk classroom buildings, parking lot and play area. Building concrete (a or c8); structural steel (c51); rough carpentry (b or c5); built-up bituminous roofing (c39); doors, frames and hardware (d28); aluminum storefront and glazing (c17); metal stud framing, insulation and drywall (b or c5 or c9); lath and plaster (c35); fire suppression (c16); plumbing (c36); hvac (c20); electrical (c10); photovoltaic solar panels (c10 or c46); site utilities (a or c34 or c36).
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis