Discover Opportunities months before the RFP drops
Learn more →Demolish existing concrete paving slabs to expose tree root intrusion and storm drain pipe. Excavate and expose tree root and existing storm water pipe for site investigations. Verify existing storm water pipe and invert at 2 cleanout locations. Backfill and compact soil for concrete paving slab replacement.
Posted Date
Dec 9, 2025
Due Date
Dec 18, 2025
Release: Dec 9, 2025
Close: Dec 18, 2025
Demolish existing concrete paving slabs to expose tree root intrusion and storm drain pipe. Excavate and expose tree root and existing storm water pipe for site investigations. Verify existing storm water pipe and invert at 2 cleanout locations. Backfill and compact soil for concrete paving slab replacement.
AvailableSchool boiler sections replacement.
Posted Date
Dec 5, 2025
Due Date
Dec 16, 2025
Release: Dec 5, 2025
Close: Dec 16, 2025
School boiler sections replacement.
AvailableFurnish and install water bottle filler station unit with water filtration unit at two (2) existing drinking fountain locations. In addition, furnish and install one (1) exterior hi-lo free standing drinking fountain with water bottle filler station and water filtration unit. This also includes removal of the existing drinking fountain and wall finishes affected by new works.
Posted Date
Dec 5, 2025
Due Date
Dec 12, 2025
Release: Dec 5, 2025
Close: Dec 12, 2025
Furnish and install water bottle filler station unit with water filtration unit at two (2) existing drinking fountain locations. In addition, furnish and install one (1) exterior hi-lo free standing drinking fountain with water bottle filler station and water filtration unit. This also includes removal of the existing drinking fountain and wall finishes affected by new works.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis