Discover Opportunities months before the RFP drops
Learn more →Replace existing roof-top HVAC equipment with new equipment, completely reroof the entire school, and to provide all periphery works as required in the Contract Documents. The scopes of work to be completed include, but are not limited to, the following: Selective Demolition, Masonry Repairs, Rough Carpentry, Membrane Roofing, Translucent Sandwich Panel Systems (Skylight Replacement), Plumbing, HVAC, Electrical, and Fire Alarm Systems.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Replace existing roof-top HVAC equipment with new equipment, completely reroof the entire school, and to provide all periphery works as required in the Contract Documents. The scopes of work to be completed include, but are not limited to, the following: Selective Demolition, Masonry Repairs, Rough Carpentry, Membrane Roofing, Translucent Sandwich Panel Systems (Skylight Replacement), Plumbing, HVAC, Electrical, and Fire Alarm Systems.
AvailableHigh school: this project is to relocate the existing mdf room to new room b113 - mdf and to relocate the existing electrical service to new service location. The scopes of work to be completed at rogers high school include, but are not limited to, the following: structural & building demolition, selective demolition, selective salvaging & reuse/relocation of existing materials/components, masonry, rough carpentry, roofing modifications, doors/frames/door hardware, gypsum board assemblies, sealed concrete finishing, painting, plumbing, hvac, electrical, & communications systems. See outside link.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
High school: this project is to relocate the existing mdf room to new room b113 - mdf and to relocate the existing electrical service to new service location. The scopes of work to be completed at rogers high school include, but are not limited to, the following: structural & building demolition, selective demolition, selective salvaging & reuse/relocation of existing materials/components, masonry, rough carpentry, roofing modifications, doors/frames/door hardware, gypsum board assemblies, sealed concrete finishing, painting, plumbing, hvac, electrical, & communications systems. See outside link.
AvailableProvide speech-language pathology services for 2025-2026 school year.
Posted Date
Sep 14, 2025
Due Date
Sep 25, 2025
Release: Sep 14, 2025
Close: Sep 25, 2025
Provide speech-language pathology services for 2025-2026 school year.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis