Discover Opportunities months before the RFP drops
Learn more →Work includes installation of drainage piping, construction and redevelopment of swales, installation of drainage structures, and clearing, grubbing, and stabilizing discharge easements around (2) existing roads.
Posted Date
Dec 6, 2025
Due Date
Jan 14, 2026
Release: Dec 6, 2025
Close: Jan 14, 2026
Work includes installation of drainage piping, construction and redevelopment of swales, installation of drainage structures, and clearing, grubbing, and stabilizing discharge easements around (2) existing roads.
AvailableProvide the civil work required for the new boat ramp and parking, construction of a gravel parking lot, concrete walkways / sidewalks, new double concrete boat ramp, docks, aluminum gangways, floating docks, and asphalt aprons connected to existing roadway, etc on approx 2.88 acres.
Posted Date
Nov 25, 2025
Due Date
Jan 6, 2026
Release: Nov 25, 2025
Close: Jan 6, 2026
Provide the civil work required for the new boat ramp and parking, construction of a gravel parking lot, concrete walkways / sidewalks, new double concrete boat ramp, docks, aluminum gangways, floating docks, and asphalt aprons connected to existing roadway, etc on approx 2.88 acres.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis