Discover Opportunities months before the RFP drops
Learn more →Work includes replacement of the deaerator at central utility plant. Contractor shall be responsible for demolition and replacement of existing deaerator and surge tank including all associated piping, valves and controls. In addition, contractor shall install four (4) steam line meters and one (1) condensate return meter. The deaerator, surge tank, and the meters shall be integrated into the existing plant metasys (JCI) control system. Prior to conducting any work, contractor shall field verify existing conditions. See attached files.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Work includes replacement of the deaerator at central utility plant. Contractor shall be responsible for demolition and replacement of existing deaerator and surge tank including all associated piping, valves and controls. In addition, contractor shall install four (4) steam line meters and one (1) condensate return meter. The deaerator, surge tank, and the meters shall be integrated into the existing plant metasys (JCI) control system. Prior to conducting any work, contractor shall field verify existing conditions. See attached files.
AvailableProvide ticketing platform services.
Posted Date
Nov 21, 2025
Due Date
Dec 5, 2025
Release: Nov 21, 2025
Close: Dec 5, 2025
Provide ticketing platform services.
Provide ticketing platform services.
Posted Date
Nov 21, 2025
Due Date
Dec 5, 2025
Release: Nov 21, 2025
Close: Dec 5, 2025
Provide ticketing platform services.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis