Discover Opportunities months before the RFP drops
Learn more →Project includes construction of a new Avgas (100LL) and Jet-A aircraft fueling system. The construction of the new fueling system includes the fabrication, procurement, and installation of two new 12,000-gallon aboveground storage tank (AST) fuel tanks, fuel dispensing equipment. Additional project elements include the construction of new fueling equipment foundations, drainage improvements, and electrical improvements.
Posted Date
Jun 2, 2025
Due Date
Jun 26, 2025
Release: Jun 2, 2025
Close: Jun 26, 2025
Project includes construction of a new Avgas (100LL) and Jet-A aircraft fueling system. The construction of the new fueling system includes the fabrication, procurement, and installation of two new 12,000-gallon aboveground storage tank (AST) fuel tanks, fuel dispensing equipment. Additional project elements include the construction of new fueling equipment foundations, drainage improvements, and electrical improvements.
Project consists of sampling, testing, removal, hauling and land application of approximately 385 dry tons of liquid lagoon biosolids via surface application. The sludge to be removed is approximately 7.08% solids. The Port has DEQ-approved land application sites. Biosolids land application is authorized for the sites on a seasonal basis from June 15th through October 15th. Care must be taken to avoid wet soil conditions, so it is anticipated that the appropriate work window will be mid-July through early October. Work is anticipated for 2025.
Posted Date
Sep 13, 2024
Due Date
Oct 15, 2024
Release: Sep 13, 2024
Close: Oct 15, 2024
Project consists of sampling, testing, removal, hauling and land application of approximately 385 dry tons of liquid lagoon biosolids via surface application. The sludge to be removed is approximately 7.08% solids. The Port has DEQ-approved land application sites. Biosolids land application is authorized for the sites on a seasonal basis from June 15th through October 15th. Care must be taken to avoid wet soil conditions, so it is anticipated that the appropriate work window will be mid-July through early October. Work is anticipated for 2025.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis