Discover Opportunities months before the RFP drops
Learn more →Furnish key Railroad Wayside Automatic Equipment Identification (AEI) Reader System components for installation at Richland Junction, Center Parkway, Mile Post 18.84. The purpose of this procurement is to obtain a system for railcar identification, tracking, and operational data management through a proven and industry-standard AEI system.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
Furnish key Railroad Wayside Automatic Equipment Identification (AEI) Reader System components for installation at Richland Junction, Center Parkway, Mile Post 18.84. The purpose of this procurement is to obtain a system for railcar identification, tracking, and operational data management through a proven and industry-standard AEI system.
AvailableWork includes: -Repair existing cracks on all runway, taxiway, taxilane, and apron pavement. -Apply slurry seal to all runway, taxiway, taxilane, and apron pavement. -Restore pavement markings impacted by slurry seal. -Replace Runway 8-26 existing medium intensity edge lights (MIRLs) with new LED fixtures and system. -Replace all existing taxiway edge reflectors on Taxiway A and the connector taxiways. -Replace all existing Runway 8-26 related signage with LED fixtures and system. -Replace Runway 8 PAPI (Port owned) with LED fixtures and system. -Replace Runway 26 PAPI (Port owned) with LED fixtures and system. -Replace Runway 8 REIL (Port owned) with LED fixtures and system. -Replace Runway 26 REIL (Port owned) with LED fixtures and system. -Replace the lighted primary wind cone with LED fixtures. It is assumed that the segmented circle will not be impacted as a part of this project. -Replace the existing non-lighted supplemental wind cone with a lighted LED fixture. -Replace and modify the existing electrical room vault, including new regulator, panel board, disconnect switch, radio control unit and associated antenna, and various other components. See outside link.
Posted Date
Aug 5, 2025
Due Date
Aug 26, 2025
Release: Aug 5, 2025
Close: Aug 26, 2025
Work includes: -Repair existing cracks on all runway, taxiway, taxilane, and apron pavement. -Apply slurry seal to all runway, taxiway, taxilane, and apron pavement. -Restore pavement markings impacted by slurry seal. -Replace Runway 8-26 existing medium intensity edge lights (MIRLs) with new LED fixtures and system. -Replace all existing taxiway edge reflectors on Taxiway A and the connector taxiways. -Replace all existing Runway 8-26 related signage with LED fixtures and system. -Replace Runway 8 PAPI (Port owned) with LED fixtures and system. -Replace Runway 26 PAPI (Port owned) with LED fixtures and system. -Replace Runway 8 REIL (Port owned) with LED fixtures and system. -Replace Runway 26 REIL (Port owned) with LED fixtures and system. -Replace the lighted primary wind cone with LED fixtures. It is assumed that the segmented circle will not be impacted as a part of this project. -Replace the existing non-lighted supplemental wind cone with a lighted LED fixture. -Replace and modify the existing electrical room vault, including new regulator, panel board, disconnect switch, radio control unit and associated antenna, and various other components. See outside link.
Facilitate development of a strategic plan for the port. The plan was last updated in 2020. Support and provide development of a multi-year strategic plan to support decision-making for the port's operating and capital budgets.
Posted Date
Feb 18, 2025
Due Date
Mar 7, 2025
Release: Feb 18, 2025
Close: Mar 7, 2025
Facilitate development of a strategic plan for the port. The plan was last updated in 2020. Support and provide development of a multi-year strategic plan to support decision-making for the port's operating and capital budgets.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis