Learn more →Project will renovate approx. 10,569 SF of existing space within the 40,552-square-foot facility. Work includes selective demolition, new partitions and finishes, MEP system modifications, technology and AV integration, and related site improvements
Posted Date
Nov 24, 2025
Due Date
Dec 30, 2025
Release: Nov 24, 2025
Close: Dec 30, 2025
Project will renovate approx. 10,569 SF of existing space within the 40,552-square-foot facility. Work includes selective demolition, new partitions and finishes, MEP system modifications, technology and AV integration, and related site improvements
AvailableWork includes the demolition and proper disposal of the existing water heater and the installation of two new high-efficiency water heaters, as outlined in the bridgers & paxton construction documents. The contractor shall furnish all necessary labor, materials, tools, equipment,repair/replace any roof/wall penetrations and supervision required to complete the work in full compliance with the project specifications, manufacturer requirements, and all applicable local, state, and federal codes. The installation shall include all associated mechanical, plumbing, and electrical connections, including piping, valves, fittings, insulation, venting, and controls integration to ensure a fully functional and efficient system.
Posted Date
Oct 9, 2025
Due Date
Oct 31, 2025
Release: Oct 9, 2025
Close: Oct 31, 2025
Work includes the demolition and proper disposal of the existing water heater and the installation of two new high-efficiency water heaters, as outlined in the bridgers & paxton construction documents. The contractor shall furnish all necessary labor, materials, tools, equipment,repair/replace any roof/wall penetrations and supervision required to complete the work in full compliance with the project specifications, manufacturer requirements, and all applicable local, state, and federal codes. The installation shall include all associated mechanical, plumbing, and electrical connections, including piping, valves, fittings, insulation, venting, and controls integration to ensure a fully functional and efficient system.
The project includes replacement and repair of exposed duct insulation on multiple rooftop units, transition pieces, and exhaust fan stacks. Work will involve caulking, painting, and sealing all repaired and new insulation to ensure durability and weather protection. Contractors should also provide alternate pricing for wrapping insulation similar to the kitchen RTUs and a unit price for reinsulating roof hose bibs.
Posted Date
Sep 4, 2025
Due Date
Oct 9, 2025
Release: Sep 4, 2025
Close: Oct 9, 2025
The project includes replacement and repair of exposed duct insulation on multiple rooftop units, transition pieces, and exhaust fan stacks. Work will involve caulking, painting, and sealing all repaired and new insulation to ensure durability and weather protection. Contractors should also provide alternate pricing for wrapping insulation similar to the kitchen RTUs and a unit price for reinsulating roof hose bibs.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.