Learn more →The Perry Township Municipal Authority (Snyder County, PA) requests bids for the 2025-WW1 Sewer Collection and Pump Stations project, which includes construction of approximately 8,200 linear feet of 6", 8", and 12" gravity sewer lines, two submersible wastewater pump stations, ~900 LF of wastewater force mains and ~675 LF of a 6" waterline extension with appurtenances. The procurement is posted as an IFB on the PennBid (Bonfire) portal with an estimated contract value of $2,315,000 and requires submission of bidding documents, bonded bid and specified certifications. Bids are submitted through the Bonfire portal; several bid documents and an Addendum #1 are posted on the Bonfire opportunity (download requires Bonfire login).
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
The Perry Township Municipal Authority (Snyder County, PA) requests bids for the 2025-WW1 Sewer Collection and Pump Stations project, which includes construction of approximately 8,200 linear feet of 6", 8", and 12" gravity sewer lines, two submersible wastewater pump stations, ~900 LF of wastewater force mains and ~675 LF of a 6" waterline extension with appurtenances. The procurement is posted as an IFB on the PennBid (Bonfire) portal with an estimated contract value of $2,315,000 and requires submission of bidding documents, bonded bid and specified certifications. Bids are submitted through the Bonfire portal; several bid documents and an Addendum #1 are posted on the Bonfire opportunity (download requires Bonfire login).
AvailableThe project involves the construction of a new 0.1 mgd package Wastewater Treatment Plant. This includes components such as an influent vault, metering, headworks, screen, SBR treatment tanks, UV disinfection, blowers, yard piping, and new electrical service. Additionally, it encompasses duct banks, a new process control and blower building, and the demolition of the existing treatment plant and electrical systems.
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
The project involves the construction of a new 0.1 mgd package Wastewater Treatment Plant. This includes components such as an influent vault, metering, headworks, screen, SBR treatment tanks, UV disinfection, blowers, yard piping, and new electrical service. Additionally, it encompasses duct banks, a new process control and blower building, and the demolition of the existing treatment plant and electrical systems.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis