Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the construction of a new 0.1 mgd package Wastewater Treatment Plant. This includes components such as an influent vault, metering, headworks, screen, SBR treatment tanks, UV disinfection, blowers, yard piping, and new electrical service. Additionally, it encompasses duct banks, a new process control and blower building, and the demolition of the existing treatment plant and electrical systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Construction of a new 0.1 mgd package Wastewater Treatment Plant including but not limited to influent vault and metering, headworks and screen, SBR treatment concrete tanks and equipment, UV disinfection, blowers, yard piping, new electrical service, duct banks, new process control and blower building, demolition of existing treatment plant and existing electrical, and all associated appurtenances.
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
Construction of a new 0.1 mgd package Wastewater Treatment Plant including but not limited to influent vault and metering, headworks and screen, SBR treatment concrete tanks and equipment, UV disinfection, blowers, yard piping, new electrical service, duct banks, new process control and blower building, demolition of existing treatment plant and existing electrical, and all associated appurtenances.
AvailableThe Perry Township Municipal Authority (Snyder County, PA) requests bids for the 2025-WW1 Sewer Collection and Pump Stations project, which includes construction of approximately 8,200 linear feet of 6", 8", and 12" gravity sewer lines, two submersible wastewater pump stations, ~900 LF of wastewater force mains and ~675 LF of a 6" waterline extension with appurtenances. The procurement is posted as an IFB on the PennBid (Bonfire) portal with an estimated contract value of $2,315,000 and requires submission of bidding documents, bonded bid and specified certifications. Bids are submitted through the Bonfire portal; several bid documents and an Addendum #1 are posted on the Bonfire opportunity (download requires Bonfire login).
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
The Perry Township Municipal Authority (Snyder County, PA) requests bids for the 2025-WW1 Sewer Collection and Pump Stations project, which includes construction of approximately 8,200 linear feet of 6", 8", and 12" gravity sewer lines, two submersible wastewater pump stations, ~900 LF of wastewater force mains and ~675 LF of a 6" waterline extension with appurtenances. The procurement is posted as an IFB on the PennBid (Bonfire) portal with an estimated contract value of $2,315,000 and requires submission of bidding documents, bonded bid and specified certifications. Bids are submitted through the Bonfire portal; several bid documents and an Addendum #1 are posted on the Bonfire opportunity (download requires Bonfire login).
AvailableProject consists generally of 2025 automatic bar screen wastewater treatment plant and related items.
Posted Date
Dec 3, 2025
Due Date
Jan 23, 2026
Release: Dec 3, 2025
Close: Jan 23, 2026
Project consists generally of 2025 automatic bar screen wastewater treatment plant and related items.
AvailableConstruction of a new wastewater treatment plant consisting of preliminary, secondary biological nutrients removal, tertiary filtration, disinfection, and sludge treatment facilities, and site improvements.
Posted Date
Nov 20, 2025
Due Date
Jan 13, 2026
Release: Nov 20, 2025
Close: Jan 13, 2026
Construction of a new wastewater treatment plant consisting of preliminary, secondary biological nutrients removal, tertiary filtration, disinfection, and sludge treatment facilities, and site improvements.