Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Perry Township
Construction of a new 0.1 mgd package Wastewater Treatment Plant including but not limited to influent vault and metering, headworks and screen, SBR treatment concrete tanks and equipment, UV disinfection, blowers, yard piping, new electrical service, duct banks, new process control and blower building, demolition of existing treatment plant and existing electrical, and all associated appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Perry Township
Construction of ±8200 LF of 6", 8", and 12" gravity sewer lines and associated manholes. It also includes two submersible wastewater pump stations and ±900 LF of wastewater force mains. The project will also include ±675 LF of a 6" waterline extension and appurtenances.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Perry Township
Close: Dec 18, 2025
Construction of ±8200 LF of 6", 8", and 12" gravity sewer lines and associated manholes. It also includes two submersible wastewater pump stations and ±900 LF of wastewater force mains. The project will also include ±675 LF of a 6" waterline extension and appurtenances.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Ottawa
Construction of a new wastewater treatment plant consisting of preliminary, secondary biological nutrients removal, tertiary filtration, disinfection, and sludge treatment facilities, and site improvements.
Posted Date
Nov 20, 2025
Due Date
Jan 13, 2026
Release: Nov 20, 2025
City of Ottawa
Close: Jan 13, 2026
Construction of a new wastewater treatment plant consisting of preliminary, secondary biological nutrients removal, tertiary filtration, disinfection, and sludge treatment facilities, and site improvements.
AvailableCity of Parlier
Work consist of replacement of an existing aerated lagoon wastewater treatment plant and a new extended aeration treatment facility.
Posted Date
Jan 10, 2024
Due Date
Dec 3, 2025
Release: Jan 10, 2024
City of Parlier
Close: Dec 3, 2025
Work consist of replacement of an existing aerated lagoon wastewater treatment plant and a new extended aeration treatment facility.
AvailableTown of Alma
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
Posted Date
Oct 31, 2025
Due Date
Dec 19, 2025
Release: Oct 31, 2025
Town of Alma
Close: Dec 19, 2025
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.