Discover Opportunities months before the RFP drops
Learn more →Pendleton County Commission is requesting sealed bids for renovations to the General Services Center in Franklin, WV, including window repair/replacement, selective demolition, new HVAC, plumbing and electrical modifications, and new partitions and finishes. Bids are due December 16, 2025 at 1:30 pm local time, with a mandatory pre‑bid conference on December 1, 2025 at 2:00 pm.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Pendleton County Commission is requesting sealed bids for renovations to the General Services Center in Franklin, WV, including window repair/replacement, selective demolition, new HVAC, plumbing and electrical modifications, and new partitions and finishes. Bids are due December 16, 2025 at 1:30 pm local time, with a mandatory pre‑bid conference on December 1, 2025 at 2:00 pm.
AvailableDesign/build General Services Center Renovations The project will be bid under a single Prime Contract with the General Contractor awarded the job providing licensed/certified electrical, HVAC, plumbing and other work as needed. The project involves the repair and/or replacement of windows (Number to be determined based on price & funding available), selective demolition of interior systems, partitions, and finishes, installation of new HVAC systems, modification of existing plumbing and electrical systems, and the installation of new partitions and finishes.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Close: Dec 16, 2025
Design/build General Services Center Renovations The project will be bid under a single Prime Contract with the General Contractor awarded the job providing licensed/certified electrical, HVAC, plumbing and other work as needed. The project involves the repair and/or replacement of windows (Number to be determined based on price & funding available), selective demolition of interior systems, partitions, and finishes, installation of new HVAC systems, modification of existing plumbing and electrical systems, and the installation of new partitions and finishes.
AvailableThe project consists of a 3 story addition consisting of insulated concrete form and face brick. Interior walls are metal stud with drywall. Floor system consist of steel bar joists, steel deck, concrete with wood roof trusses. Existing building is on the historical register. The new addition shall be built first and then the renovation work may be started.
Posted Date
Jan 7, 2025
Due Date
Feb 5, 2025
Release: Jan 7, 2025
Close: Feb 5, 2025
The project consists of a 3 story addition consisting of insulated concrete form and face brick. Interior walls are metal stud with drywall. Floor system consist of steel bar joists, steel deck, concrete with wood roof trusses. Existing building is on the historical register. The new addition shall be built first and then the renovation work may be started.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis