Discover Opportunities months before the RFP drops
Learn more →Work include remove existing roof system and all components, disposal of existing roof system, add tapered panels as needed to roof structure to slope roof for proper drainage, install 2 layers of Poly-Iso insulation (R-30) over entire roof, flash and or fabricate all HVAC curbs, skylights, drains and penetrations, install new 60 mil tpo membrane roof system over Poly-Iso insulation, install steel cap on top of parapet walls to install continuous hold down cleat.
Posted Date
Nov 21, 2025
Due Date
Dec 20, 2025
Release: Nov 21, 2025
Close: Dec 20, 2025
Work include remove existing roof system and all components, disposal of existing roof system, add tapered panels as needed to roof structure to slope roof for proper drainage, install 2 layers of Poly-Iso insulation (R-30) over entire roof, flash and or fabricate all HVAC curbs, skylights, drains and penetrations, install new 60 mil tpo membrane roof system over Poly-Iso insulation, install steel cap on top of parapet walls to install continuous hold down cleat.
AvailableProject includes remove existing stucco, foam and existing rock around exterior perimeter to expose exterior stud wall, remove all exterior windows and provide windows with installation of low e aluminum frame glass windows, remove all exterior doors and replace them with aluminum store front doors, provide material and install OSB around entire exterior wall, provide material and install exterior vapor barrier around exterior perimeter, provide material and install 3 (three) foot brick veneer around entire exterior perimeter, provide material and install transition cap for brick veneer to metal siding transition, install metal siding around exterior perimeter.
Posted Date
Nov 21, 2025
Due Date
Dec 20, 2025
Release: Nov 21, 2025
Close: Dec 20, 2025
Project includes remove existing stucco, foam and existing rock around exterior perimeter to expose exterior stud wall, remove all exterior windows and provide windows with installation of low e aluminum frame glass windows, remove all exterior doors and replace them with aluminum store front doors, provide material and install OSB around entire exterior wall, provide material and install exterior vapor barrier around exterior perimeter, provide material and install 3 (three) foot brick veneer around entire exterior perimeter, provide material and install transition cap for brick veneer to metal siding transition, install metal siding around exterior perimeter.
AvailableGeneral and/or special Legal Counsel Services from one or more firms or individuals who can demonstrate proficient expertise in Indian Law, Tribal Governance, Water Law, Economic Development, and Tribal Employment as needed.
Posted Date
Sep 29, 2025
Due Date
Oct 30, 2025
Release: Sep 29, 2025
Close: Oct 30, 2025
General and/or special Legal Counsel Services from one or more firms or individuals who can demonstrate proficient expertise in Indian Law, Tribal Governance, Water Law, Economic Development, and Tribal Employment as needed.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis