Discover Opportunities months before the RFP drops
Learn more →The principal components of work include the following items: 1. Installation of approximately 5.3 miles of 30-inch water transmission pipe and associated improvements. 2. Sectional, air, and blowoff valves. 3. Wash Crossings. 4. Jack and Bore Crossings 5. Traffic Management.
Posted Date
Nov 13, 2025
Due Date
Dec 6, 2025
Release: Nov 13, 2025
Close: Dec 6, 2025
The principal components of work include the following items: 1. Installation of approximately 5.3 miles of 30-inch water transmission pipe and associated improvements. 2. Sectional, air, and blowoff valves. 3. Wash Crossings. 4. Jack and Bore Crossings 5. Traffic Management.
Provide TPP governor air compressors. 2 EA.
Posted Date
Sep 5, 2025
Due Date
Sep 11, 2025
Release: Sep 5, 2025
Close: Sep 11, 2025
Provide TPP governor air compressors. 2 EA.
The Bureau of Reclamation seeks proposals for the replacement of a 70-ton gantry crane and a 60-ton bridge crane at the John W. Keys Pump-Generating Plant, including design, removal, installation, and commissioning of cranes and associated systems.
Posted Date
-
Due Date
-
Close: -
The Bureau of Reclamation seeks proposals for the replacement of a 70-ton gantry crane and a 60-ton bridge crane at the John W. Keys Pump-Generating Plant, including design, removal, installation, and commissioning of cranes and associated systems.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis