Learn more →2026 county travel guide. Quantity: 30,000, 35,000 and 40,000. Folded size: 8.375 "W x 10.875 "H, Flat Size: 16.75"W x 10.875"H, Trim Size: 8 3/8" W X 10 7/8 "H, pages: 56+4.
Posted Date
Dec 9, 2025
Due Date
Dec 18, 2025
Release: Dec 9, 2025
Close: Dec 18, 2025
2026 county travel guide. Quantity: 30,000, 35,000 and 40,000. Folded size: 8.375 "W x 10.875 "H, Flat Size: 16.75"W x 10.875"H, Trim Size: 8 3/8" W X 10 7/8 "H, pages: 56+4.
AvailableProject includes the removal of the existing concrete culvert, and replacement with a 3-sided single span precast concrete span unit structure supported by micropiles (to rock) on spread footings, and associated highway approach work and stream work. The project also includes the relocation of approx. 200 LF of water main.
Posted Date
Oct 2, 2025
Due Date
Oct 30, 2025
Release: Oct 2, 2025
Close: Oct 30, 2025
Project includes the removal of the existing concrete culvert, and replacement with a 3-sided single span precast concrete span unit structure supported by micropiles (to rock) on spread footings, and associated highway approach work and stream work. The project also includes the relocation of approx. 200 LF of water main.
Construction of a new 42ft span precast concrete bridge with a 75-year service life. The bridge will be widened to two 11-foot lanes and 4-foot shoulders, with an improved hydraulic opening to adequately pass the 100 year-storm. Approach roadway reconstruction will be done to allow for excavation and construction of the bridge as well as approving geometry. Medium stone streambank protection will be used to prevent erosion, and new approach guiderail and bridge railing will be installed.
Posted Date
Sep 24, 2025
Due Date
Oct 20, 2025
Release: Sep 24, 2025
Close: Oct 20, 2025
Construction of a new 42ft span precast concrete bridge with a 75-year service life. The bridge will be widened to two 11-foot lanes and 4-foot shoulders, with an improved hydraulic opening to adequately pass the 100 year-storm. Approach roadway reconstruction will be done to allow for excavation and construction of the bridge as well as approving geometry. Medium stone streambank protection will be used to prevent erosion, and new approach guiderail and bridge railing will be installed.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis