Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new 42ft span precast concrete bridge with a 75-year service life. The bridge will be widened to two 11-foot lanes and 4-foot shoulders, with an improved hydraulic opening to adequately pass the 100 year-storm. Approach roadway reconstruction will be done to allow for excavation and construction of the bridge as well as approving geometry. Medium stone streambank protection will be used to prevent erosion, and new approach guiderail and bridge railing will be installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Illinois Department of Transportation (District 7) is soliciting bids to replace the bridge carrying IL 105 over Long Creek, 0.5 miles east of Oakley Road in Macon County (SN 058-0044). The project entails a complete bridge replacement with an expected duration of 70 working days and is identified as Federal Project BR308M(955). Bids are due at the January 16, 2026 letting at 12:00 PM Central.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The Illinois Department of Transportation (District 7) is soliciting bids to replace the bridge carrying IL 105 over Long Creek, 0.5 miles east of Oakley Road in Macon County (SN 058-0044). The project entails a complete bridge replacement with an expected duration of 70 working days and is identified as Federal Project BR308M(955). Bids are due at the January 16, 2026 letting at 12:00 PM Central.
Premium
Access the largest public sector contact database
Work includes clearing and grubbing within right of way, removal and disposal of existing pavement 524.000 SY, removal and disposal of existing culvert 30' x 13', unclassified excavation 82.000 CY, borrow excavation 3,843.000 CY, fine grading 900.000 SY, liquid asphalt binder pg64-22 14.500 Ton, asphalt base course - type b 240.000 Ton, asphalt surface course type c 58.000 Ton, traffic control, barricade - type iii 84.000 LF, permanent construction signs (ground mounted) 184.000 SF, construction zone electric changeable message sign (trailer 2.000 EA, type b - flashing light 16.000 EA, pavement markings(temporary-paint) 4" white solid lines 1, 188.000 LF. See attached file.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work includes clearing and grubbing within right of way, removal and disposal of existing pavement 524.000 SY, removal and disposal of existing culvert 30' x 13', unclassified excavation 82.000 CY, borrow excavation 3,843.000 CY, fine grading 900.000 SY, liquid asphalt binder pg64-22 14.500 Ton, asphalt base course - type b 240.000 Ton, asphalt surface course type c 58.000 Ton, traffic control, barricade - type iii 84.000 LF, permanent construction signs (ground mounted) 184.000 SF, construction zone electric changeable message sign (trailer 2.000 EA, type b - flashing light 16.000 EA, pavement markings(temporary-paint) 4" white solid lines 1, 188.000 LF. See attached file.
AvailableRelease: Dec 10, 2025
Close: Jan 6, 2026
Bridge replacement project.
AvailableWork consists of the replacement of the existing bridge and addressing an existing slope failure. During construction of the bridge, traffic will be maintained using temporary approaches and a temporary bridge structure to the east of the existing bridge and near the slope failure area.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
Work consists of the replacement of the existing bridge and addressing an existing slope failure. During construction of the bridge, traffic will be maintained using temporary approaches and a temporary bridge structure to the east of the existing bridge and near the slope failure area.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis