Discover Opportunities months before the RFP drops
Learn more →Procurement of one Tailstock Lathe for the Oregon Manufacturing Innovation Center - Research and Development (OMIC R&D).
Posted Date
Dec 3, 2025
Due Date
Dec 29, 2025
Release: Dec 3, 2025
Close: Dec 29, 2025
Procurement of one Tailstock Lathe for the Oregon Manufacturing Innovation Center - Research and Development (OMIC R&D).
AvailableSolicitation for one (1) new tabletop Scanning Electron Microscope (SEM) with integrated Energy Dispersive X‑ray Spectroscopy (EDS). Bid must meet detailed Exhibit A specs (e.g., tungsten filament, 1–20 kV, ~15 nm SE resolution, motorized 5‑axis stage, oil‑free vacuum, SE/BSE detectors; SDD EDS 10–30 mm², ~125–135 eV resolution, real‑time mapping/quantification). Requirements: equipment new (≤6 months build life), warranty details, include training and three‑year maintenance, freight FOB Destination (Scappoose, OR), shipping and installation costs, installation labor at State of Oregon prevailing wage, SDS/JSA and safety plan, and specify required gases/chiller. Electronic bids via email (≤25 MB).
Posted Date
Dec 3, 2025
Due Date
Dec 29, 2025
Release: Dec 3, 2025
Close: Dec 29, 2025
Solicitation for one (1) new tabletop Scanning Electron Microscope (SEM) with integrated Energy Dispersive X‑ray Spectroscopy (EDS). Bid must meet detailed Exhibit A specs (e.g., tungsten filament, 1–20 kV, ~15 nm SE resolution, motorized 5‑axis stage, oil‑free vacuum, SE/BSE detectors; SDD EDS 10–30 mm², ~125–135 eV resolution, real‑time mapping/quantification). Requirements: equipment new (≤6 months build life), warranty details, include training and three‑year maintenance, freight FOB Destination (Scappoose, OR), shipping and installation costs, installation labor at State of Oregon prevailing wage, SDS/JSA and safety plan, and specify required gases/chiller. Electronic bids via email (≤25 MB).
AvailableSealed lump-sum bids for campus electrical distribution construction (installation/upgrade of electrical distribution systems) at Oregon Tech's Klamath Falls campus. Public works contract subject to Oregon prevailing wage and public-works bonding; mandatory pre-bid conference for bidders; MWESB participation encouraged.
Posted Date
Oct 28, 2025
Due Date
Nov 20, 2025
Release: Oct 28, 2025
Close: Nov 20, 2025
Sealed lump-sum bids for campus electrical distribution construction (installation/upgrade of electrical distribution systems) at Oregon Tech's Klamath Falls campus. Public works contract subject to Oregon prevailing wage and public-works bonding; mandatory pre-bid conference for bidders; MWESB participation encouraged.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis