Discover Opportunities months before the RFP drops
Learn more →Onslow County School District requests bids for construction consisting of stair replacement at New Bridge Middle School and a breezeway enclosure at White Oak High School in Jacksonville, North Carolina. Bids are received by physical submission at Onslow County Schools offices; mandatory pre-bid meetings were held on November 13, 2025 at both sites. Plans and specifications are distributed via Smith Sinnett Architecture’s document request portal, with addenda posted publicly.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Onslow County School District requests bids for construction consisting of stair replacement at New Bridge Middle School and a breezeway enclosure at White Oak High School in Jacksonville, North Carolina. Bids are received by physical submission at Onslow County Schools offices; mandatory pre-bid meetings were held on November 13, 2025 at both sites. Plans and specifications are distributed via Smith Sinnett Architecture’s document request portal, with addenda posted publicly.
AvailableProcure two (2) 24’ x36’ modular classrooms and set up. See outside link.
Posted Date
Nov 24, 2025
Due Date
Dec 11, 2025
Release: Nov 24, 2025
Close: Dec 11, 2025
Procure two (2) 24’ x36’ modular classrooms and set up. See outside link.
Replacement of the chiller supply and return lines. Cut and remove any concrete as needed to remove/replace chiller lines. Remove mechanical room floor at entry point of chiller lines at exterior wall to run lines into and connect to existing nearest flanges. Temporary removal of existing condensing unit next to boiler room as necessary. Must use dry nitrogen for any soldering required for reconnection of refrigerant lines and for standing pressure test for leaks. Must pull system down to 500-micron vacuum, recharge with recovered refrigerant, insulate, with new insulation, refrigerant lines in work area and add any refrigerant, if needed, to fully charge system.
Posted Date
Nov 17, 2025
Due Date
Dec 3, 2025
Release: Nov 17, 2025
Close: Dec 3, 2025
Replacement of the chiller supply and return lines. Cut and remove any concrete as needed to remove/replace chiller lines. Remove mechanical room floor at entry point of chiller lines at exterior wall to run lines into and connect to existing nearest flanges. Temporary removal of existing condensing unit next to boiler room as necessary. Must use dry nitrogen for any soldering required for reconnection of refrigerant lines and for standing pressure test for leaks. Must pull system down to 500-micron vacuum, recharge with recovered refrigerant, insulate, with new insulation, refrigerant lines in work area and add any refrigerant, if needed, to fully charge system.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis