Discover Opportunities months before the RFP drops
Learn more →Work includes approx 1,130 LF of 8" water line, bores, fire hydrants and other appurtenances. See outside link.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Close: Dec 17, 2025
Work includes approx 1,130 LF of 8" water line, bores, fire hydrants and other appurtenances. See outside link.
AvailableWork to be accomplished under this Contract: BASE BID 1.Construct approximately 723 L.F. of 12” HDPE DR-17 sanitary sewer by trenching; 2.Construct approximately 2,395 L.F. of 10” HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct approximately 5,116 L.F. of 8” HDPE DR-17 sanitary sewer by bursting and trenching; 4.Construct twelve (12) 4’-diameter manholes, remove and replace sixteen (16) 4’-diameter, 5’-diameter, and 6’-diameter manholes. ADD ALTERNATE 1 1.Construct approximately 2,951 L.F. of 10” HDPE DR-17 sanitary sewer by bursting and trenching; 2.Construct approximately 3,982 L.F. of 8” HDPE DR-17 sanitary sewer by bursting and trenching; 3.Remove and replace nine (9) remove and replace 5’-diameter manholes. Note: The system must stay in operation throughout construction. Temporary pumping, piping, plugs, shut offs, etc. shall be considered incidental and included in the cost of other bid items.
Posted Date
Sep 23, 2025
Due Date
Dec 8, 2025
Release: Sep 23, 2025
Close: Dec 8, 2025
Work to be accomplished under this Contract: BASE BID 1.Construct approximately 723 L.F. of 12” HDPE DR-17 sanitary sewer by trenching; 2.Construct approximately 2,395 L.F. of 10” HDPE DR-17 sanitary sewer by bursting and trenching; 3.Construct approximately 5,116 L.F. of 8” HDPE DR-17 sanitary sewer by bursting and trenching; 4.Construct twelve (12) 4’-diameter manholes, remove and replace sixteen (16) 4’-diameter, 5’-diameter, and 6’-diameter manholes. ADD ALTERNATE 1 1.Construct approximately 2,951 L.F. of 10” HDPE DR-17 sanitary sewer by bursting and trenching; 2.Construct approximately 3,982 L.F. of 8” HDPE DR-17 sanitary sewer by bursting and trenching; 3.Remove and replace nine (9) remove and replace 5’-diameter manholes. Note: The system must stay in operation throughout construction. Temporary pumping, piping, plugs, shut offs, etc. shall be considered incidental and included in the cost of other bid items.
Provide water plant sludge removal at water treatment plant.
Posted Date
Apr 15, 2025
Due Date
May 6, 2025
Release: Apr 15, 2025
Close: May 6, 2025
Provide water plant sludge removal at water treatment plant.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis