Discover Opportunities months before the RFP drops
Learn more →Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
AvailableWork includes construction of approx 2,894 LF of 12" dia gravity sewer main to replace the existing 8" gravity sewer line between parkway boulevard and oconee connector, video taping of gravity sewer route, additional crushed stone bedding, including excavation of unsuitable material 500 CY, rock removal 350 CY, construction access road (cr) 350 SY, construction exit (co) 2 EA, temp silt fence c (sd1) 5,180 LF, hay bales 100 EA, slope stabilization (ss) 6,750 SY, rip rap (ch-2) 250 SY, bypass pumping, standard sewer manhole, 48" dia. 146 VF, large diameter manhole base, 60" dia. See attached file.
Posted Date
Oct 15, 2025
Due Date
Nov 13, 2025
Release: Oct 15, 2025
Close: Nov 13, 2025
Work includes construction of approx 2,894 LF of 12" dia gravity sewer main to replace the existing 8" gravity sewer line between parkway boulevard and oconee connector, video taping of gravity sewer route, additional crushed stone bedding, including excavation of unsuitable material 500 CY, rock removal 350 CY, construction access road (cr) 350 SY, construction exit (co) 2 EA, temp silt fence c (sd1) 5,180 LF, hay bales 100 EA, slope stabilization (ss) 6,750 SY, rip rap (ch-2) 250 SY, bypass pumping, standard sewer manhole, 48" dia. 146 VF, large diameter manhole base, 60" dia. See attached file.
Design & installation of a horizontal protective net canopy. Project will also include the removal of existing netting canopy.
Posted Date
Oct 3, 2025
Due Date
Oct 24, 2025
Release: Oct 3, 2025
Close: Oct 24, 2025
Design & installation of a horizontal protective net canopy. Project will also include the removal of existing netting canopy.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis