Discover Opportunities months before the RFP drops
Learn more →Work includes installing approximately 950 linear feet of 6-inch dr 18 c900 pvc water main within the alley. Excavation, backfill, and compaction; installation of one fire hydrant; installation of twenty-one (21) 1-inch water service lines with reconnection to existing meters; tie-ins to existing water mains at 1st, 2nd, and 3rd streets; cutting and capping of the existing 2-inch water main; restoration of gravel roads and driveway approaches to their pre-construction condition; saw-cutting and replacement of asphalt in 2nd street; replace existing water meters as needed if damaged; any special construction at the water-sewer crossing; repair existing water and sewer mains as needed if damaged. See outside link.
Posted Date
-
Due Date
Dec 4, 2025
Release: -
Close: Dec 4, 2025
Work includes installing approximately 950 linear feet of 6-inch dr 18 c900 pvc water main within the alley. Excavation, backfill, and compaction; installation of one fire hydrant; installation of twenty-one (21) 1-inch water service lines with reconnection to existing meters; tie-ins to existing water mains at 1st, 2nd, and 3rd streets; cutting and capping of the existing 2-inch water main; restoration of gravel roads and driveway approaches to their pre-construction condition; saw-cutting and replacement of asphalt in 2nd street; replace existing water meters as needed if damaged; any special construction at the water-sewer crossing; repair existing water and sewer mains as needed if damaged. See outside link.
Work includes installing approximately 950 linear feet of 6-inch dr 18 c900 pvc water main within the alley. Excavation, backfill, and compaction; installation of one fire hydrant; installation of twenty-one (21) 1-inch water service lines with reconnection to existing meters; tie-ins to existing water mains at 1st, 2nd, and 3rd streets; cutting and capping of the existing 2-inch water main; restoration of gravel roads and driveway approaches to their pre-construction condition; saw-cutting and replacement of asphalt in 2nd street; replace existing water meters as needed if damaged; any special construction at the water-sewer crossing; repair existing water and sewer mains as needed if damaged. See outside link.
Posted Date
-
Due Date
Dec 4, 2025
Release: -
Close: Dec 4, 2025
Work includes installing approximately 950 linear feet of 6-inch dr 18 c900 pvc water main within the alley. Excavation, backfill, and compaction; installation of one fire hydrant; installation of twenty-one (21) 1-inch water service lines with reconnection to existing meters; tie-ins to existing water mains at 1st, 2nd, and 3rd streets; cutting and capping of the existing 2-inch water main; restoration of gravel roads and driveway approaches to their pre-construction condition; saw-cutting and replacement of asphalt in 2nd street; replace existing water meters as needed if damaged; any special construction at the water-sewer crossing; repair existing water and sewer mains as needed if damaged. See outside link.
Provide carvers arena and revitalization area environmental review services.
Posted Date
Oct 16, 2025
Due Date
Nov 13, 2025
Release: Oct 16, 2025
Close: Nov 13, 2025
Provide carvers arena and revitalization area environmental review services.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis