Discover Opportunities months before the RFP drops
Learn more →The North Carolina Department of Public Safety – NC National Guard (NCNG) - Construction Facilities Management Office (CFMO) is seeking a contractor to replace the existing chain link fence at the Joint Force Headquarters Complex with a new fence that matches or blends with the existing ornament fence.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
The North Carolina Department of Public Safety – NC National Guard (NCNG) - Construction Facilities Management Office (CFMO) is seeking a contractor to replace the existing chain link fence at the Joint Force Headquarters Complex with a new fence that matches or blends with the existing ornament fence.
AvailableProvide hazard event material and services to provide construction of roads and small pipe repair on private roads and accesses which sustained damage or erosion as a result of declared natural disasters, include, but are not limited to: 1. Clearing/grading/earthwork 2. Asphalt and stone bases and pavements 3. Erosion control 4. Slope protection and stabilization 5. Utility coordination 6. Compliance with local and state permitting requirements 7. Seeding and mulching 8. Bridge construction. See attached file for full scope.
Posted Date
Dec 8, 2025
Due Date
Jan 9, 2026
Release: Dec 8, 2025
Close: Jan 9, 2026
Provide hazard event material and services to provide construction of roads and small pipe repair on private roads and accesses which sustained damage or erosion as a result of declared natural disasters, include, but are not limited to: 1. Clearing/grading/earthwork 2. Asphalt and stone bases and pavements 3. Erosion control 4. Slope protection and stabilization 5. Utility coordination 6. Compliance with local and state permitting requirements 7. Seeding and mulching 8. Bridge construction. See attached file for full scope.
AvailableBuild a new tower at our site and decommission the existing tower. Work includes removing all existing equipment, and installing a new 293'-0" self-support tower, with a 11'-6"x24'-0" prefabricated equipment shelter and a generator, all within a new 82'-2"x52'-2" chain-link fenced compound.
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
Close: Dec 22, 2025
Build a new tower at our site and decommission the existing tower. Work includes removing all existing equipment, and installing a new 293'-0" self-support tower, with a 11'-6"x24'-0" prefabricated equipment shelter and a generator, all within a new 82'-2"x52'-2" chain-link fenced compound.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis