Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide hazard event material and services to provide construction of roads and small pipe repair on private roads and accesses which sustained damage or erosion as a result of declared natural disasters, include, but are not limited to: 1. Clearing/grading/earthwork 2. Asphalt and stone bases and pavements 3. Erosion control 4. Slope protection and stabilization 5. Utility coordination 6. Compliance with local and state permitting requirements 7. Seeding and mulching 8. Bridge construction. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The North Carolina Department of Public Safety, Division of Emergency Management (NCEM) is soliciting bids to replace private bridges and roadway approaches at four damaged sites in Haywood, Yancey, and Buncombe Counties following Hurricane Helene. NCEM will contract directly with the awarded vendor to restore safe access for residents and emergency services, with work to begin within 15 days of notice to proceed and a contract completion date of January 14, 2027. The procurement is funded/authorized under federal and state disaster assistance authorities (FEMA/Stafford Act) but is being administered by NCEM as a solicitation for construction services.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
The North Carolina Department of Public Safety, Division of Emergency Management (NCEM) is soliciting bids to replace private bridges and roadway approaches at four damaged sites in Haywood, Yancey, and Buncombe Counties following Hurricane Helene. NCEM will contract directly with the awarded vendor to restore safe access for residents and emergency services, with work to begin within 15 days of notice to proceed and a contract completion date of January 14, 2027. The procurement is funded/authorized under federal and state disaster assistance authorities (FEMA/Stafford Act) but is being administered by NCEM as a solicitation for construction services.
AvailableThe project will consist of Roadway Reconstruction on Campville Road, commencing near the intersection of Mason Hill Road / Smith Road and proceeding northerly for a distance of 2,285 F to the intersection with Hopkins Road. The Roadway Reconstruction will involve full‐depth reconstruction of the roadway, installation of underdrain and other miscellaneous work.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
The project will consist of Roadway Reconstruction on Campville Road, commencing near the intersection of Mason Hill Road / Smith Road and proceeding northerly for a distance of 2,285 F to the intersection with Hopkins Road. The Roadway Reconstruction will involve full‐depth reconstruction of the roadway, installation of underdrain and other miscellaneous work.
Available(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
(740-Ft) Bridge Superstructure reconstruction, approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis