Discover Opportunities months before the RFP drops
Learn more →Project includes undertaken by residential life to make upgrades within all resident rooms and add laundry facilities on each floor in the mcelroy e hall residence wing. This wing contains 103 student rooms, with slight variations to configurations. Approximate size of an average resident room is 169 sq. Ft.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Project includes undertaken by residential life to make upgrades within all resident rooms and add laundry facilities on each floor in the mcelroy e hall residence wing. This wing contains 103 student rooms, with slight variations to configurations. Approximate size of an average resident room is 169 sq. Ft.
AvailableThe project is for full replacement of the existing ballasted EPDM roof system at the Bemidji State University PE Complex with a new gravel-surfaced built-up roof. Work includes new through-wall flashing at masonry transitions, minor modifications to roof drainage, and limited replacement of mechanical equipment at new access ladders and safety railings. Bemidji State University (part of the Minnesota State system) is soliciting contractors for this construction project; instructions and documents are available from the source posting (QuestCDN link) referenced on the aggregator page.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
The project is for full replacement of the existing ballasted EPDM roof system at the Bemidji State University PE Complex with a new gravel-surfaced built-up roof. Work includes new through-wall flashing at masonry transitions, minor modifications to roof drainage, and limited replacement of mechanical equipment at new access ladders and safety railings. Bemidji State University (part of the Minnesota State system) is soliciting contractors for this construction project; instructions and documents are available from the source posting (QuestCDN link) referenced on the aggregator page.
AvailableThe solicitation requests renovation work for two primary scopes: converting a lower-level library space into an expanded data closet and modified storage area, and renovating several academic program spaces (Founder's Hall academic program area, Nursing Simulation Lab in New Main, and Fine Arts area in Saint John's Hall). The project is identified as a rebid and includes full renovations that must meet the outlined scope for each location. The estimated contract value range on HigherGov is approximately $500,000 - $2,000,000 and the buyer is Minnesota State University.
Posted Date
Dec 9, 2025
Due Date
Dec 18, 2025
Release: Dec 9, 2025
Close: Dec 18, 2025
The solicitation requests renovation work for two primary scopes: converting a lower-level library space into an expanded data closet and modified storage area, and renovating several academic program spaces (Founder's Hall academic program area, Nursing Simulation Lab in New Main, and Fine Arts area in Saint John's Hall). The project is identified as a rebid and includes full renovations that must meet the outlined scope for each location. The estimated contract value range on HigherGov is approximately $500,000 - $2,000,000 and the buyer is Minnesota State University.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis