Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Minnesota State University Mankato
The solicitation requests renovation work for two primary scopes: converting a lower-level library space into an expanded data closet and modified storage area, and renovating several academic program spaces (Founder's Hall academic program area, Nursing Simulation Lab in New Main, and Fine Arts area in Saint John's Hall). The project is identified as a rebid and includes full renovations that must meet the outlined scope for each location. The estimated contract value range on HigherGov is approximately $500,000 - $2,000,000 and the buyer is Minnesota State University.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Metropolitan State University
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
Posted Date
Oct 28, 2025
Due Date
Dec 18, 2025
Release: Oct 28, 2025
Metropolitan State University
Close: Dec 18, 2025
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Cuny Hunter College
North academic center accessibility center renovation and asbestos abatement - cr12 general construction.
Posted Date
Oct 16, 2025
Due Date
Dec 10, 2025
Release: Oct 16, 2025
Cuny Hunter College
Close: Dec 10, 2025
North academic center accessibility center renovation and asbestos abatement - cr12 general construction.
Scott Ford House, Inc.
Project involves the interior demolition and initial renovation of an historic house. Scope of work includes conducting selective demolition, installing interior framing, securing existing window openings, roughing-in plumbing, installing HVAC system, installing electrical power system and temporary lighting, and initial installation of data and telephone, fire alarm, and security systems.
Posted Date
Jul 14, 2025
Due Date
Dec 11, 2025
Release: Jul 14, 2025
Scott Ford House, Inc.
Close: Dec 11, 2025
Project involves the interior demolition and initial renovation of an historic house. Scope of work includes conducting selective demolition, installing interior framing, securing existing window openings, roughing-in plumbing, installing HVAC system, installing electrical power system and temporary lighting, and initial installation of data and telephone, fire alarm, and security systems.
AvailableNew York Dormitory Authority
Provide construction services for renovation of the existing office and academic spaces designated for student accessibility center. Scope of work includes General Construction work such as selective demolition, new walls, ceilings, flooring, and finishes. Electrical work such as new wiring, new light fixtures, and new power. HVAC work includes new ductwork and connection to existing building system. BMS work includes new control wiring and connection into existing system. Sprinkler such as modifying existing system and adding new sprinkler heads as needed. IT work such as new cabling and data points.
Posted Date
Oct 20, 2025
Due Date
Dec 18, 2025
Release: Oct 20, 2025
New York Dormitory Authority
Close: Dec 18, 2025
Provide construction services for renovation of the existing office and academic spaces designated for student accessibility center. Scope of work includes General Construction work such as selective demolition, new walls, ceilings, flooring, and finishes. Electrical work such as new wiring, new light fixtures, and new power. HVAC work includes new ductwork and connection to existing building system. BMS work includes new control wiring and connection into existing system. Sprinkler such as modifying existing system and adding new sprinkler heads as needed. IT work such as new cabling and data points.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →