Retrieving RFP details
Release
Close
Cuny Hunter College
North academic center accessibility center renovation and asbestos abatement - cr12 general construction.
New York Dormitory Authority
Provide construction services for renovation of the existing office and academic spaces designated for student accessibility center. Scope of work includes General Construction work such as selective demolition, new walls, ceilings, flooring, and finishes. Electrical work such as new wiring, new light fixtures, and new power. HVAC work includes new ductwork and connection to existing building system. BMS work includes new control wiring and connection into existing system. Sprinkler such as modifying existing system and adding new sprinkler heads as needed. IT work such as new cabling and data points.
New York Dormitory Authority
Psychiatric center building 7 interior renovation & window replacement with associated asbestos abatement. The scope of work for Building 7 will include asbestos abatement, interior demolition, removal and replacement of existing windows and storefront, masonry repairs, interior construction, new interior finishes, finish carpentry, built-in casework, selective plumbing demolition, installation of new plumbing fixtures, domestic water piping distribution, complete bathroom and toilet room updates, fire protection system improvements, HVAC instrumentation and controls, electrical service and distribution, interior lighting, electrical connections to equipment, communication, security as well as fire alarm system improvements.
Metropolitan State University
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
Release
Oct 16, 2025
Close
Dec 10, 2025