Discover Opportunities months before the RFP drops
Learn more →Prepare storm sewer segments for lining with a cure in place liner (CIPL). Preparation includes labor and equipment and supplies required for cleaning segments as needed for ensuring proper bonding of liner to storm sewer pipe, diversion of storm water in system as needed to maintain proper street drainage of area, removal of backflow valve, and other task required for preparing system for lining. Line the identified segments of the storm sewer main line with CIPL. Includes all labor, equipment and supplies (including liner), needed to line approx., 550' of storm sewer, opening of liner and cutting out lateral intakes, sealing of ends of lined segments and cutouts. Post installation video inspection to verify completion and sealing requirements are met. Includes all labor, equipment, and video data processing and deliverable. Fluid/sediment waste handling and disposal from storm sewer cleaning and lining as applicable. Fluid and sediments removed during cleaning are to be considered petroleum contaminated. Includes all labor, equipment, transportation, and disposal costs for removed fluids and sediments during preparation of the storm sewer and if applicable fluid waste generated during lining procedure.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Prepare storm sewer segments for lining with a cure in place liner (CIPL). Preparation includes labor and equipment and supplies required for cleaning segments as needed for ensuring proper bonding of liner to storm sewer pipe, diversion of storm water in system as needed to maintain proper street drainage of area, removal of backflow valve, and other task required for preparing system for lining. Line the identified segments of the storm sewer main line with CIPL. Includes all labor, equipment and supplies (including liner), needed to line approx., 550' of storm sewer, opening of liner and cutting out lateral intakes, sealing of ends of lined segments and cutouts. Post installation video inspection to verify completion and sealing requirements are met. Includes all labor, equipment, and video data processing and deliverable. Fluid/sediment waste handling and disposal from storm sewer cleaning and lining as applicable. Fluid and sediments removed during cleaning are to be considered petroleum contaminated. Includes all labor, equipment, transportation, and disposal costs for removed fluids and sediments during preparation of the storm sewer and if applicable fluid waste generated during lining procedure.
AvailableInstallation of four Aquasential Whole Home PFAS filtration systems for the treatment of perfluoroalkyl substances (PFAS) in four residential homes in Ely, MN.
Posted Date
Dec 9, 2025
Due Date
Dec 19, 2025
Release: Dec 9, 2025
Close: Dec 19, 2025
Installation of four Aquasential Whole Home PFAS filtration systems for the treatment of perfluoroalkyl substances (PFAS) in four residential homes in Ely, MN.
AvailableTo provide supplies, equipment, installation, changeouts, repairs, and maintenance of water treatment systems at residential, and small commercial or noncommunity public water supply wells throughout the State of Minnesota, on an as-needed basis for M-562(5) Contract Release.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
To provide supplies, equipment, installation, changeouts, repairs, and maintenance of water treatment systems at residential, and small commercial or noncommunity public water supply wells throughout the State of Minnesota, on an as-needed basis for M-562(5) Contract Release.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis