Discover Opportunities months before the RFP drops
Learn more →Project consists of but not limited to: Interior renovations to vacant units at 489 Lebanon St and 969 Main St. Both units are upper floors of 2-family wood-framed houses. Work includes new finishes and cabinetry, painting, plumbing, electrical, new heating systems, new electrical service, mold remediation, asbestos abatement, lead remediation. Site work at 969 Main St includes a new water line from the street and new underground electrical service. Reconstruct an exterior wood-framed structure.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
Project consists of but not limited to: Interior renovations to vacant units at 489 Lebanon St and 969 Main St. Both units are upper floors of 2-family wood-framed houses. Work includes new finishes and cabinetry, painting, plumbing, electrical, new heating systems, new electrical service, mold remediation, asbestos abatement, lead remediation. Site work at 969 Main St includes a new water line from the street and new underground electrical service. Reconstruct an exterior wood-framed structure.
AvailableProject consists of but not limited to: interior renovations to vacant units. Both units are upper floors of 2-family wood-framed houses. Work includes new finishes and cabinetry, painting, plumbing, electrical, new heating systems, new electrical service, mold remediation, asbestos abatement, lead remediation. Site work at 969 main st includes a new water line from the street and new underground electrical service. Reconstruct an exterior wood-framed stair and new concrete walkway in the back yard.
Posted Date
Nov 5, 2025
Due Date
Dec 19, 2025
Release: Nov 5, 2025
Close: Dec 19, 2025
Project consists of but not limited to: interior renovations to vacant units. Both units are upper floors of 2-family wood-framed houses. Work includes new finishes and cabinetry, painting, plumbing, electrical, new heating systems, new electrical service, mold remediation, asbestos abatement, lead remediation. Site work at 969 main st includes a new water line from the street and new underground electrical service. Reconstruct an exterior wood-framed stair and new concrete walkway in the back yard.
AvailableThe project involves the replacement of existing Federal Pacific load centers and panel boards. The scope of work includes relocating existing feeders and branch circuit wiring to new load center and panel board locations. Additionally, the work encompasses limited asbestos abatement.
Posted Date
Jun 13, 2025
Due Date
Jul 29, 2025
Release: Jun 13, 2025
Close: Jul 29, 2025
The project involves the replacement of existing Federal Pacific load centers and panel boards. The scope of work includes relocating existing feeders and branch circuit wiring to new load center and panel board locations. Additionally, the work encompasses limited asbestos abatement.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis