Learn more →Production well includes the following items of work: Drilling of new production well; Installation of well casing and fittings, inclusive; Installation of well pump and appurtenances; Installation of piping to connection point at well building; Installation of pitless adapter.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Production well includes the following items of work: Drilling of new production well; Installation of well casing and fittings, inclusive; Installation of well pump and appurtenances; Installation of piping to connection point at well building; Installation of pitless adapter.
Electrical Construction Contract (EC-03) includes the following items of work: New electrical service to extend to the chlorination building; All control systems inclusive of the tank and valve chamber. Including Construction of the stormwater improvements; Construction of the Access Roadway; Interconnection with the existing MAJA water system, inclusive of 4,000 LF of 6" piping; Interconnection with the existing MAJA sewer system, inclusive of 1,400 LF of 6" piping; Interconnection with the existing MAJA sewer system, inclusive of 1,400 LF of 6" piping; Inter-unit Piping (Piping between storage tank, valve chamber and well house).
Posted Date
Aug 4, 2025
Due Date
Oct 21, 2025
Release: Aug 4, 2025
Close: Oct 21, 2025
Electrical Construction Contract (EC-03) includes the following items of work: New electrical service to extend to the chlorination building; All control systems inclusive of the tank and valve chamber. Including Construction of the stormwater improvements; Construction of the Access Roadway; Interconnection with the existing MAJA water system, inclusive of 4,000 LF of 6" piping; Interconnection with the existing MAJA sewer system, inclusive of 1,400 LF of 6" piping; Interconnection with the existing MAJA sewer system, inclusive of 1,400 LF of 6" piping; Inter-unit Piping (Piping between storage tank, valve chamber and well house).
The general construction contract (GC-02) includes: general site civil construction of the access roadway construction of the stormwater improvements interconnection with the existing Maja water system, inclusive of xxx ft of 6in piping attitude valve chamber chlorination building. The electrical construction contract (EC-03) includes: new electrical service to extend to the chlorination building all control systems inclusive of the tank and valve chamber
Posted Date
Jun 13, 2025
Due Date
Jul 30, 2025
Release: Jun 13, 2025
Close: Jul 30, 2025
The general construction contract (GC-02) includes: general site civil construction of the access roadway construction of the stormwater improvements interconnection with the existing Maja water system, inclusive of xxx ft of 6in piping attitude valve chamber chlorination building. The electrical construction contract (EC-03) includes: new electrical service to extend to the chlorination building all control systems inclusive of the tank and valve chamber
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis