Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Electrical Construction Contract (EC-03) includes the following items of work: New electrical service to extend to the chlorination building; All control systems inclusive of the tank and valve chamber. Including Construction of the stormwater improvements; Construction of the Access Roadway; Interconnection with the existing MAJA water system, inclusive of 4,000 LF of 6" piping; Interconnection with the existing MAJA sewer system, inclusive of 1,400 LF of 6" piping; Interconnection with the existing MAJA sewer system, inclusive of 1,400 LF of 6" piping; Inter-unit Piping (Piping between storage tank, valve chamber and well house).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of a transmission line, water well electrical service, and associated appurtenances.
Posted Date
Nov 18, 2025
Due Date
Dec 22, 2025
Release: Nov 18, 2025
Close: Dec 22, 2025
Construction of a transmission line, water well electrical service, and associated appurtenances.
AvailableConstruction manager at risk for the water campus.
Posted Date
Nov 7, 2025
Due Date
Dec 23, 2025
Release: Nov 7, 2025
Close: Dec 23, 2025
Construction manager at risk for the water campus.
AvailableWork includes Clearing and Grubbing, 536 CY of Borrow Excavation (Contractor Furnished FME, Class 9), 200 CY of Channel Excavation (FM), 64 CY of Crushed Stone, Size 610, (FM). See attached file.
Posted Date
Oct 9, 2025
Due Date
Jan 26, 2026
Release: Oct 9, 2025
Close: Jan 26, 2026
Work includes Clearing and Grubbing, 536 CY of Borrow Excavation (Contractor Furnished FME, Class 9), 200 CY of Channel Excavation (FM), 64 CY of Crushed Stone, Size 610, (FM). See attached file.
AvailableConstruction of aeration improvements on existing water tower including pump station, piping and electrical.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Construction of aeration improvements on existing water tower including pump station, piping and electrical.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis