Learn more →Work includes demolition and replacement of the roofs at three critical water pump stations.
Posted Date
Oct 25, 2025
Due Date
Dec 13, 2025
Release: Oct 25, 2025
Close: Dec 13, 2025
Work includes demolition and replacement of the roofs at three critical water pump stations.
AvailableWork includes removal of a partially collapsed existing stone retaining wall. The partially collapsed existing stone retaining wall, located behind the garage, will be replaced with a precast modular block gravity wall (precast wall) in the same location with a comparable footprint and elevations.
Posted Date
Oct 22, 2025
Due Date
Dec 2, 2025
Release: Oct 22, 2025
Close: Dec 2, 2025
Work includes removal of a partially collapsed existing stone retaining wall. The partially collapsed existing stone retaining wall, located behind the garage, will be replaced with a precast modular block gravity wall (precast wall) in the same location with a comparable footprint and elevations.
Project includes the installation of new impressed current cathodic protection systems and installation of rectifiers, close-coupled anode groundbeds, junction boxes, wire and conduit and Telog remote monitoring systems at the Shafts E, L, N and W Sites.
Posted Date
May 28, 2025
Due Date
Jul 25, 2025
Release: May 28, 2025
Close: Jul 25, 2025
Project includes the installation of new impressed current cathodic protection systems and installation of rectifiers, close-coupled anode groundbeds, junction boxes, wire and conduit and Telog remote monitoring systems at the Shafts E, L, N and W Sites.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis