Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal of a partially collapsed existing stone retaining wall. The partially collapsed existing stone retaining wall, located behind the garage, will be replaced with a precast modular block gravity wall (precast wall) in the same location with a comparable footprint and elevations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
Posted Date
Oct 21, 2025
Due Date
Dec 18, 2025
Release: Oct 21, 2025
Close: Dec 18, 2025
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
AvailablePremium
Access the largest public sector contact database
The U.S. Army Corps of Engineers (USACE), Walla Walla District, is soliciting proposals to procure spare transformers for the Lower Snake River hydroelectric powerhouses. The solicitation requires Hitachi-brand bushings (a single-source item) for a portion of the contract; the estimated cost for the brand-name portion is $1,691,335.30 and the overall transformer contract is estimated at about $40 million. The opportunity is a procurement (not a grant), is active, and proposals are due Feb 4, 2026 at 5:00 PM PST.
Posted Date
Dec 5, 2025
Due Date
Feb 5, 2026
Release: Dec 5, 2025
Close: Feb 5, 2026
The U.S. Army Corps of Engineers (USACE), Walla Walla District, is soliciting proposals to procure spare transformers for the Lower Snake River hydroelectric powerhouses. The solicitation requires Hitachi-brand bushings (a single-source item) for a portion of the contract; the estimated cost for the brand-name portion is $1,691,335.30 and the overall transformer contract is estimated at about $40 million. The opportunity is a procurement (not a grant), is active, and proposals are due Feb 4, 2026 at 5:00 PM PST.
AvailableProvide shaft, shouldered, NSN 3040011152386, Qty 8 UI Ea
Posted Date
Nov 27, 2025
Due Date
Dec 12, 2025
Release: Nov 27, 2025
Close: Dec 12, 2025
Provide shaft, shouldered, NSN 3040011152386, Qty 8 UI Ea
Boardwalk and retaining wall repairs. Replace 800 SF of 2"-thick x 6"-wide pressure-treated boardwalk, replace 1,120 SF of 2"-thick x 6"-wide pressure-treated boardwalk. Replace 201 CF of retaining wall. See attached file.
Posted Date
Dec 1, 2025
Due Date
Jan 14, 2026
Release: Dec 1, 2025
Close: Jan 14, 2026
Boardwalk and retaining wall repairs. Replace 800 SF of 2"-thick x 6"-wide pressure-treated boardwalk, replace 1,120 SF of 2"-thick x 6"-wide pressure-treated boardwalk. Replace 201 CF of retaining wall. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis