Learn more →work includes providing all materials, equipment, labor and supervision for the construction of gravel access roads to specified siphon and junction structures, selective clearing and tree removal, and the following improvements to the structures: waterproofing, new structure tops for specified structures, new access hatches and manhole frames and covers, crack repair, interior surface lining, and addition of passive odor control for specified structures.
Posted Date
Dec 5, 2025
Due Date
Jan 24, 2026
Release: Dec 5, 2025
Close: Jan 24, 2026
work includes providing all materials, equipment, labor and supervision for the construction of gravel access roads to specified siphon and junction structures, selective clearing and tree removal, and the following improvements to the structures: waterproofing, new structure tops for specified structures, new access hatches and manhole frames and covers, crack repair, interior surface lining, and addition of passive odor control for specified structures.
AvailableWork involves a major Level E overhaul of two (2) of the main air compressors, and a lessor Level C overhaul of the remaining two (2) compressors. The contract term is 730 calendar days.
Posted Date
Dec 5, 2025
Due Date
Jan 15, 2026
Release: Dec 5, 2025
Close: Jan 15, 2026
Work involves a major Level E overhaul of two (2) of the main air compressors, and a lessor Level C overhaul of the remaining two (2) compressors. The contract term is 730 calendar days.
AvailableInstallation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Installation of pipelines, meters, valves and appurtenances, and rehabilitation of existing water pipelines includes cleaning and cement mortar lining of approx. 769 LF of 60" steel water main; structural lining of approx. 540 LF of 60" steel water main; furnishing and installing valves, precast and cast in place valve vaults, air valves, blow-off valve assemblies, manholes and all appurtenant work along the 12,207 LF.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis